thepermitmap

Street · 3252 of 8,567 by permit count

Building permits on Newport Ave

The City of Toronto has 51 building permits on record for Newport Ave, going back to 2002. Those permits created 6 homes and removed 2, a net change of +4. Declared construction value totals $757K. The most recent permit was issued Sep 8, 2026 at 130 Newport Ave.

Permits on record
512002–2026
Declared construction value
$757Kas filed, not adjusted
Homes created
6dwelling units
Homes removed
2net +4

Permits issued per year

20022026 (part year)

Most common work

  • Building Permit Related(PS)10 · 20%
  • Building Permit Related(MS)7 · 14%
  • Building Permit Related (DR)6 · 12%
  • Multiple Projects5 · 10%
  • New Building5 · 10%
  • Back Water Valve (Sewer only)4 · 8%
  • Demolition3 · 6%
  • Garage2 · 4%
  • Interior Alterations2 · 4%
  • Second Suite (New)1 · 2%
  • Fire Alarm1 · 2%
  • Underpinning1 · 2%

Structures worked on

  • SFD - Detached40 · 78%
  • 2 Unit - Detached5 · 10%
  • Elementary School2 · 4%
  • Retail Store2 · 4%
  • Secondary School1 · 2%
  • Multiple Use/Non Residential1 · 2%

Most recent permits

Issued Work What was filed Value Status
Sep 8, 2026 Multiple Projects Proposal for interior alterations to existing finished basement to create a secondary dwelling unit, including construction of a new interior partition wall, installation of a stove and washer/dryer, and associated plumbing and electrical work. No structural alterations proposed. $15K Open
Aug 14, 2026 Multiple Projects Proposal for interior alterations to existing finished basement to create a secondary dwelling unit, including construction of a new interior partition wall, installation of a stove and washer/dryer, and associated plumbing and electrical work. No structural alterations proposed. $15K Closed
May 2, 2023 Fire Alarm Fire Alarm Upgrade to existing school $8K Open
Sep 28, 2021 Building Permit Related(PS) Plumbing - Proposal for alterations to the existing basement and proposing a secondary suite and fire shutter window on the left side of the building. Open
Sep 28, 2021 Second Suite (New) Proposal for alterations to the existing basement and proposing a secondary suite and fire shutter window on the left side of the building for 126 A. $5K Open
Jun 28, 2021 New Building Rev 01 - Interior alterations to existing basement to create a secondary suite and proposed a fire shutter window on the left side of the buildingProposal to construct a 2-storey single family dwelling with integral garage and finished basement. New build
Apr 1, 2019 Multiple Projects REVISION - revised insulation values and beam and joist layoutAddition of existing single family dwelling, interior alterations, rear deck and a balcony. Open
Apr 1, 2019 Building Permit Related(MS) HVAC - Addition of existing single family dwelling, interior alterations, reak deck and a balcony. Open
Sep 12, 2018 Building Permit Related (DR) Drain - Proposal to construct a 2-storey single family dwelling with integral garage and finished basement. Closed
Sep 12, 2018 Building Permit Related (DR) Drain - Proposal to construct a 2-storey single family dwelling with integral garage and finished basement. Closed
Sep 12, 2018 New Building Proposal to construct a 2-storey single family dwelling with integral garage and finished basement. $200K New build
Sep 12, 2018 Building Permit Related(PS) Plumbing - Proposal to construct a 2-storey single family dwelling with integral garage and finished basement. Closed
Sep 12, 2018 Building Permit Related(PS) Plumbing - Proposal to construct a 2-storey single family dwelling with integral garage and finished basement. Closed
Sep 12, 2018 Building Permit Related(MS) HVAC - Proposal to construct a 2-storey single family dwelling with integral garage and finished basement. Closed
Sep 12, 2018 Building Permit Related(MS) HVAC - Proposal to construct a 2-storey single family dwelling with integral garage and finished basement. Closed
Sep 12, 2018 New Building Proposal to construct a 2-storey single family dwelling with integral garage and finished basement. $200K New build
Jul 24, 2018 Building Permit Related(MS) HVAC - Proposal to construct a 2-storey single family dwelling with integral garage and finished basement. Closed
Jun 7, 2018 Building Permit Related (DR) Drain - Proposal to construct a 2-storey single family dwelling with integral garage and finished basement. Closed
Jun 7, 2018 Demolition Proposal to demolish existing dwelling, sever lot into 3 and construct 3 new 2-storey single family dwellings. Demolition
Jun 7, 2018 Building Permit Related(PS) Plumbing - Proposal to construct a 2-storey single family dwelling with integral garage and finished basement. Closed
Feb 2, 2018 Building Permit Related(MS) Rev 01 - to HVACHVAC - Proposed:Interior alterations; 2 story rear addition; and rear deck Closed
Oct 13, 2017 Multiple Projects Proposed:Interior alterations; 2 story rear addition; and rear deck $50K Closed
Oct 13, 2017 Building Permit Related(PS) Plumbing - Proposed:Interior alterations; 2 story rear addition; and rear deck Closed
May 6, 2017 Building Permit Related(PS) Plumbing - Underpin basement approx. 600mm (24"), new wood stairs, new supports/footing for existing wood beam Washroom fixtures for basement reno against revised building permit for basement reno Closed
May 1, 2017 Underpinning Revision #1: to finish basementUnderpin basement approx. 600mm (24"), new wood stairs, new supports/footing for existing wood beam Closed
Apr 7, 2017 Back Water Valve (Sewer only) Back Water Valve (Sewer only) Closed
Jan 16, 2017 Building Permit Related (DR) Drain - Underpin basement approx. 600mm (24"), new wood stairs, new supports/footing for existing wood beam Closed
May 4, 2016 Building Permit Related(MS) HVAC - Proposal to construct a new 2 storey SFD. See Demo, ZZC and COA. Closed
Sep 25, 2015 Building Permit Related (DR) Drain - Proposal to construct a new 2 storey SFD. See Demo, ZZC and COA. Closed
Sep 25, 2015 Demolition Proposal to demolish existing 1 storey SFD. See active BLD 15 179187. Demolition
Sep 25, 2015 New Building Proposal to construct a new 2 storey SFD. See Demo, ZZC and COA. $150K New build
Sep 25, 2015 Building Permit Related(PS) Plumbing - Proposal to construct a new 2 storey SFD. See Demo, ZZC and COA. Closed
May 12, 2015 Multiple Projects Proposal to enclose existing front porch and construct new wood deck with stairs and ramp in front yard of existing detached - sfd. $5K Open
Jul 9, 2014 Back Water Valve (Sewer only) Install back water valve and sump pump in the basement. Closed
Jun 3, 2014 Solar Collector Proposal for the installation of a rooftop photovoltaic array on existing middle school - "Samuel Hearne Senior Middle School" $50K Closed
May 14, 2014 Building Permit Related(PS) Plumbing - create new bathroom in basement, install backwater valve and sump pump Closed
May 14, 2014 Interior Alterations create new bathroom in basement, install backwater valve and sump pump $20K Closed
May 8, 2014 Back Water Valve (Sewer only) install back water valve and sump pump Closed
Apr 9, 2014 Garage Proposal to build shed at rear of existing detached SFD. $1K Open
Sep 16, 2013 Back Water Valve (Sewer only) Install one Mainline backwater valve and one sump pump. $4K Closed

The 40 most recent of 51 permits on record. Figures come from the City’s active and cleared permit datasets, refreshed daily — what that covers, and what it misses.

Source
City of Toronto Open Data
Dataset
Building permits, active + cleared
Records
51
City refresh
2026-09-13 10:24
Page built
2026-09-13
Sheet
STR-212