Street · 2018 of 8,516 by permit count
Building permits on Nashdene Rd, Scarborough
The City of Toronto has 95 building permits on record for Nashdene Rd in Scarborough, going back to 1999. Declared construction value totals $5.4M. Half of the 88 permits issued here came through within 42 days of the application. The most recent permit was applied for Oct 1, 2026 at 125 Nashdene Rd.
- Permits on record
- 951999–2026
- Declared construction value
- $5.4Mas filed, not adjusted
- Homes created
- 0dwelling units
- Homes removed
- 0net +0
- Typical wait
- 42 days15 days slower than the city
Permits issued per year
Zoning
- Most common zone
- EH80.0% of permits · by-law 60.30
- In detached-house zones
- 0.0%38.0% below the city’s 38.0%
- Permits with a zone
- 95of 95 on record
The zoning categories the permits on Nashdene Rd fall in, under Zoning By-law 569-2013. These are the City's own category names. This counts permits, not land: it says where the building work happened under which rules, not how the area is carved up. What each zone allows, and what gets built in it.
Most common work
Structures worked on
Postal areas
Other streets in M1V
Looking for one address on Nashdene Rd? The address lookup shows every permit filed against a single house or building number.
Most recent permits
| Issued | Work | What was filed | Value | Status |
|---|---|---|---|---|
| Oct 1, 2026 | Interior Alterations | Proposal for interior alterations to warehouse layout and racking. | $420K | Open |
| Oct 1, 2026 | Building Permit Related(MS) | HVAC - Proposal for interior alterations to warehouse layout and racking. | — | Open |
| Jul 8, 2026 | Building Permit Related(MS) | HVAC - Proposal for interior alterations of the office space. | — | Open |
| Jul 8, 2026 | Interior Alterations | Proposal for interior alterations of the office space. | $150K | Open |
| Jul 8, 2026 | Building Permit Related(PS) | Plumbing - Proposal for interior alterations of the office space. | — | Open |
| Oct 6, 2025 | Interior Alterations | Interior renovation for an office, existing washroom, new partition walls. (Change of Use) | $20K | Open |
| Oct 6, 2025 | Building Permit Related(MS) | HVAC - interior renovation for an office, existing washroom, new partition walls. | — | Open |
| Aug 26, 2025 | Building Permit Related(FS) | FS - Sprinkler Shop Drawing - Interior renovation for an office, existing washroom, new partition walls. (Change of Use) | — | Open |
| Jun 24, 2025 | Other(MS) | Proposal for replacing existing hood/exhaust fan/make up lift, UNIT B37 | $10K | Open |
| Jan 15, 2025 | Multiple Projects | REVISION01: Addresses exisitng conditions discovered during construction: 1- Exisitng north boundary has no fire seperation. 2- Mezzanine load bearing walls.TO LOWER THE FLOOR TO OBTAIN LEGAL HEIGHT AND ADD WASHROOM UPSTAIRS. | — | Open |
| Apr 19, 2024 | Building Permit Related(MS) | HVAC - TO LOWER THE FLOOR TO OBTAIN LEGAL HEIGHT AND ADD WASHROOM UPSTAIRS. | — | Closed |
| Apr 19, 2024 | Building Permit Related(PS) | Plumbing - TO LOWER THE FLOOR TO OBTAIN LEGAL HEIGHT AND ADD WASHROOM UPSTAIRS. | — | Open |
| Apr 2, 2024 | Site Service | Proposed installation of an oil / water separator. | $35K | Open |
| Mar 1, 2024 | Sprinklers | Proposal for sprinklers in existing commercial space - UNIT C68 | $4K | Closed |
| Jun 29, 2022 | Fire Alarm | Fire alarm control panel replacement and indicating/initiating device replacement. | $30K | Closed |
| Mar 16, 2022 | Canopy w/o Enclosure | Addition of an open steel frame canopy at the rear of the building. | $100K | Closed |
| Nov 30, 2021 | Fire Alarm | Installation of one horn in south west office, connected to fire alarm system | $10K | Closed |
| May 4, 2021 | Inside and Outside Drains | Revision 01 - adding sump pumpDrain - Construct interior alterations | — | Open |
| Dec 16, 2020 | Inside and Outside Drains | Drain - Construct interior alterations | — | Closed |
| Dec 16, 2020 | Building Permit Related(PS) | Plumbing - Construct interior alterations | — | Closed |
| Dec 16, 2020 | Building Permit Related(MS) | HVAC - Construct interior alterations | — | Closed |
| Dec 15, 2020 | Interior Alterations | Construct interior alterations | $500K | Closed |
| Oct 30, 2020 | Fixtures/Roof Drains: Other | Proposal to add 2 sinks to hte existing food processing unit | $5K | Closed |
| Jul 3, 2019 | Building Permit Related(MS) | REV 01 - Proposed revision for HVAC layout.HVAC - Proposed interior alterations for food processing plant. | — | Closed |
| Jun 5, 2019 | Interior Alterations | Revision 01 - Proposed revisions to include changes to existing sprinkler system.Proposed interior alterations for food processing plant. | — | Closed |
| Mar 14, 2019 | Building Permit Related(PS) | REV #!-RELOCATE SINKPlumbing - Proposed interior alterations for food processing plant. | — | Closed |
| May 9, 2018 | Fixtures/Roof Drains: Other | Proposal to install 10 fixtures in existing catering facility. | $40K | Closed |
| May 9, 2018 | Special Ventilation System | Proposal to install 1 kitchen exhaust system in existing catering facility. | $40K | Closed |
| Jan 30, 2018 | Interior Alterations | REV 01 - REVISION FOR INTERIOR ALTERATIONS AS CLOUDED, PLANT EQUIPMENT LAYOUT AND EXIT PATHSProposal for interior alterations to office space on ground and second floor of an existing industrial building. | — | Closed |
| Jan 11, 2018 | Building Permit Related(PS) | REV 01 - REVISION FOR INTERIOR ALTERATIONS AS CLOUDED, PLANT EQUIPMENT LAYOUT AND EXIT PATHSPlumbing - Proposal for interior alterations to office space on ground and second floor of an existing industrial building. | — | Closed |
| Jan 11, 2018 | Building Permit Related(MS) | REV 01 - REVISION FOR INTERIOR ALTERATIONS AS CLOUDED, PLANT EQUIPMENT LAYOUT AND EXIT PATHSHVAC - Proposal for interior alterations to office space on ground and second floor of an existing industrial building. | — | Closed |
| Dec 15, 2017 | New Building | NEW 4-BAY PREFABRICATED GARAGE BUILDING FOR STORAGE OF PARKS AND RECREATION VEHICLES AND EQUIPEMENT. 1 EXTERIOR COVERED BAY. BUILDING TO BE UNHEATED. HEAT TO BE PROVIDED AT A LATER DATE. | $500K | New build |
| Dec 15, 2017 | Building Permit Related(PS) | Plumbing - NEW 4-BAY PREFABRICATED GARAGE BUILDING FOR STORAGE OF PARKS AND RECREATION VEHICLES AND EQUIPEMENT. 1 EXTERIOR COVERED BAY. BUILDING TO BE UNHEATED. HEAT TO BE PROVIDED AT A LATER DATE. | — | Open |
| Dec 15, 2017 | Building Permit Related(MS) | HVAC - NEW 4-BAY PREFABRICATED GARAGE BUILDING FOR STORAGE OF PARKS AND RECREATION VEHICLES AND EQUIPEMENT. | — | Open |
| Nov 29, 2016 | New Building | Excavate & disposal of existing asphalt & native soil. Place, compact granular as specified. Form, pour and finish footings & slab on grade as specified. Erect building as specified and restore site with granular and asphalt. | $70K | New build |
| Nov 17, 2016 | Backflow Prevention Devices (Water only) | Proposal to install a backflow prevention device in an existing building - Building D | $2K | Closed |
| Nov 17, 2016 | Backflow Prevention Devices (Water only) | Proposal to install a backflow prevention device in an existing building - Building A | $2K | Closed |
| Nov 17, 2016 | Backflow Prevention Devices (Water only) | Proposal to install a backflow prevention device in an existing multi use, commercial building - Building C | $2K | Closed |
| Nov 17, 2016 | Backflow Prevention Devices (Water only) | Proposal to install a backflow prevention device in an existing building - Building E | $2K | Closed |
| Nov 17, 2016 | Backflow Prevention Devices (Water only) | Proposal to install a backflow prevention device in an existing building - Building F | $2K | Closed |
The 40 most recent of 95 permits on record. Figures come from the City’s active and cleared permit datasets, refreshed daily — what that covers, and what it misses.
Every address on Nashdene Rd with a permit on record · 9
- 50 Nashdene Rd4 permits · to 2019
- 55 Nashdene Rd10 permits · to 2009
- 70 Nashdene Rd8 permits · to 2024
- 75 Nashdene Rd1 permit · to 2016
- 80 Nashdene Rd30 permits · to 2025
- 105 Nashdene Rd9 permits · to 2022
- 120 Nashdene Rd10 permits · to 2021
- 125 Nashdene Rd19 permits · to 2026
- 151 Nashdene Rd4 permits · to 2015