Street · 627 of 8,516 by permit count
Building permits on Meadowvale Rd, Scarborough
The City of Toronto has 278 building permits on record for Meadowvale Rd in Scarborough, going back to 1995. Those permits created 24 homes and removed 8, a net change of +16. Declared construction value totals $44.7M. Half of the 250 permits issued here came through within 38 days of the application. The most recent permit was issued Oct 30, 2026 at 812 Meadowvale Rd.
- Permits on record
- 2781995–2026
- Declared construction value
- $44.7Mas filed, not adjusted
- Homes created
- 24dwelling units
- Homes removed
- 8net +16
- Typical wait
- 38 days11 days slower than the city
Permits issued per year
Zoning
- Most common zone
- RD78.8% of permits · by-law 10.20
- In detached-house zones
- 78.8%40.8% above the city’s 38.0%
- Permits with a zone
- 226of 278 on record
The zoning categories the permits on Meadowvale Rd fall in, under Zoning By-law 569-2013. These are the City's own category names. This counts permits, not land: it says where the building work happened under which rules, not how the area is carved up. What each zone allows, and what gets built in it.
Most common work
Structures worked on
Postal areas
Where this street runs
Other streets in M1C
Looking for one address on Meadowvale Rd? The address lookup shows every permit filed against a single house or building number.
Most recent permits
| Issued | Work | What was filed | Value | Status |
|---|---|---|---|---|
| Oct 30, 2026 | Second Suite (New) | Proposal for new second unit in basement. | $25K | Open |
| Oct 19, 2026 | Sign Building Permit Related | 1 Ground Sign " ECOLE ELEMENTAIRE CATHOLIQUE SAINT-MICHEL " | — | Closed |
| Oct 14, 2026 | Second Suite (New) | Proposal for new second unit in basement. | $25K | Closed |
| Oct 7, 2026 | Building Permit Related(PS) | Revision 01: Changes to basement, ground, & second floor layouts. Plumbing - Proposal to construct a new 2 storey signle family dwelling and demolish the existing 2 storey single family dwelling | — | Open |
| Oct 7, 2026 | Building Permit Related(MS) | Revision 01: Changes to basement, ground, & second floor layouts. HVAC - Proposal to construct a new 2 storey signle family dwelling and demolish the existing 2 storey single family dwelling | — | Open |
| Oct 7, 2026 | New Building | Revision 01: Changes to basement, ground, & second floor layouts. Proposal to construct a new 2 storey signle family dwelling and demolish the existing 2 storey single family dwelling | — | New build |
| Jul 16, 2026 | Other(PS) | Plumbing alterations. | $1K | Closed |
| Jul 2, 2026 | Backflow Prevention Devices (Water only) | Install a 1-1/2" backflow prevention device | $3K | Closed |
| Jun 29, 2026 | Sign Building Permit Related | 1 Ground Sign***SAINT-MICHEL***** | — | Closed |
| Jun 4, 2026 | Other(PS) | Proposal to upgrage filtration system. | $1.0M | Open |
| May 20, 2026 | Fire Alarm | Proposal for fire alarm - replace adenco signal panel with new ircom monitor panel | $1K | Open |
| Apr 7, 2026 | Interior Alterations | Proposal to replace the two load-bearing walls with LVL beams and relocate the kitchen on the main floor. | $10K | Open |
| Dec 31, 2025 | Interior Alterations | REV01: Proposed revision for changes to layoutConverting existing single dwelling unit into a two dwelling unit house by finishing walkout basement as an accessory apartment. | — | Closed |
| Oct 28, 2025 | Building Permit Related (DR) | Drain - Proposed 2-storey rear yard garden suite with a front porch and basement walkout. | — | Open |
| Oct 28, 2025 | Building Permit Related(MS) | HVAC - Proposed 2-storey rear yard garden suite with a front porch and basement walkout. | — | Open |
| Oct 28, 2025 | New Laneway / Rear Yard Suite | Proposed 2-storey rear yard garden suite with a front porch and basement walkout. | $300K | Open |
| Oct 28, 2025 | Building Permit Related(PS) | Plumbing - Proposed 2-storey rear yard garden suite with a front porch and basement walkout. | — | Open |
| Oct 7, 2025 | Building Permit Related (DR) | Drain - Converting existing single dwelling unit into a two dwelling unit house by finishing walkout basement as an accessory apartment. | — | Closed |
| Oct 7, 2025 | Building Permit Related(PS) | Plumbing - Converting existing single dwelling unit into a two dwelling unit house by finishing walkout basement as an accessory apartment. | — | Closed |
| Aug 26, 2025 | Inside and Outside Drains | Drain - New slab on grade, single storey, wood frame Visitor Center complete with charred wood facade, PVC membrane roof, in-floor radiant heating and tripple pane floor to ceiling glazing systems. Work includes sanitary and water connections to City infrastructure, civil work and landscaping around | — | Open |
| Aug 5, 2025 | Building Permit Related (DR) | Drain - Proposal to construct a new 2 storey signle family dwelling and demolish the existing 2 storey single family dwelling | — | Open |
| Aug 5, 2025 | Demolition | Proposal to demolish existing 2 storey single family dwelling to construct a new 2 storey single family dwelling | — | Demolition |
| Jul 7, 2025 | New Building | New slab on grade, single storey, wood frame Visitor Center complete with charred wood facade, PVC membrane roof, in-floor radiant heating and tripple pane floor to ceiling glazing systems. Work includes sanitary and water connections to City infrastructure, civil work and landscaping around the pro | $4.9M | New build |
| May 7, 2025 | Building Permit Related(MS) | HVAC - Proposal for new standby natural gas generator for Fire Station 214 | — | Open |
| May 7, 2025 | Other(BA) | Proposal for new standby natural gas generator for Fire Station 214 | $288K | Open |
| May 6, 2025 | Partial Permit - Structural Framing | Conditional Permit - Part Permit - New slab on grade, single storey, wood frame Visitor Center complete with charred wood facade, PVC membrane roof, in-floor radiant heating and tripple pane floor to ceiling glazing systems. Work includes sanitary and water connections to City infrastructure, civil | — | Closed |
| May 6, 2025 | Building Permit Related(PS) | Plumbing - New slab on grade, single storey, wood frame Visitor Center complete with charred wood facade, PVC membrane roof, in-floor radiant heating and tripple pane floor to ceiling glazing systems. Work includes sanitary and water connections to City infrastructure, civil work and landscaping aro | — | Open |
| May 6, 2025 | Building Permit Related (DR) | Drain - New slab on grade, single storey, wood frame Visitor Center complete with charred wood facade, PVC membrane roof, in-floor radiant heating and tripple pane floor to ceiling glazing systems. Work includes sanitary and water connections to City infrastructure, civil work and landscaping around | — | Open |
| May 6, 2025 | Building Permit Related(MS) | HVAC - New slab on grade, single storey, wood frame Visitor Center complete with charred wood facade, PVC membrane roof, in-floor radiant heating and tripple pane floor to ceiling glazing systems. Work includes sanitary and water connections to City infrastructure, civil work and landscaping around | — | Open |
| Apr 30, 2025 | Multiple Projects | Residence roof pitch change, alterations with addition of three gables on east west and north sides. | $50K | Open |
| Jan 9, 2025 | Building Permit Related(PS) | Plumbing - Proposal for installation washer and dryer, | — | Closed |
| Jan 9, 2025 | Building Permit Related(MS) | HVAC - Proposal for installation washer and dryer, | — | Closed |
| Dec 10, 2024 | Interior Alterations | Proposal for installation washer and dryer. | $25K | Closed |
| Nov 14, 2024 | Multiple Projects | Rev 02 - Revision to proposed deckProposal for a rear deck and a porch at the side of the existing dwelling. | — | Closed |
| Sep 11, 2024 | Building Permit Related(MS) | HVAC - Proposal to upgrade polar bear pool filtration system. | — | Open |
| Sep 11, 2024 | Other(BA) | Proposal to upgrade polar bear pool filtration system. | $2.2M | Open |
| Aug 2, 2024 | Deck | Proposal for a rear deck and a porch at the side of the existing dwelling. | $30K | Closed |
| Jul 29, 2024 | Building Permit Related(FS) | FS - Sprinkler Shop Drawing - New slab on grade, single storey, wood frame Visitor Center complete with charred wood facade, PVC membrane roof, in-floor radiant heating and tripple pane floor to ceiling glazing systems. Work includes sanitary and water connections to City infrastructure, civil work | — | Closed |
| Jan 11, 2024 | Other(SR) | Proposal to install a solar PV system on the rooftop. | $58K | Closed |
| Dec 12, 2023 | Other(SR) | Proposed tree impact damage repairs to existing single family dwelling. | $35K | Open |
The 40 most recent of 278 permits on record. Figures come from the City’s active and cleared permit datasets, refreshed daily — what that covers, and what it misses.
Every address on Meadowvale Rd with a permit on record · 79
- 0 Meadowvale Rd1 permit · to 2000
- 18 Meadowvale Rd3 permits · to 2017
- 22 Meadowvale Rd2 permits · to 2011
- 25 Meadowvale Rd4 permits · to 2010
- 26 Meadowvale Rd1 permit · to 2001
- 29 Meadowvale Rd22 permits · to 2026
- 31 Meadowvale Rd5 permits · to 2018
- 41 Meadowvale Rd1 permit · to 2019
- 43 Meadowvale Rd4 permits · to 2010
- 55 Meadowvale Rd7 permits · to 2016
- 58 Meadowvale Rd3 permits · to 2004
- 61 Meadowvale Rd11 permits · to 2015
- 63 Meadowvale Rd1 permit · to 2019
- 70 Meadowvale Rd2 permits · to 2025
- 72 Meadowvale Rd1 permit · to 2023
- 75 Meadowvale Rd4 permits · to 2021
- 77 Meadowvale Rd2 permits · to 2003
- 85 Meadowvale Rd6 permits · to 2025
- 101 Meadowvale Rd3 permits · to 2022
- 106 Meadowvale Rd2 permits · to 2014
- 114 Meadowvale Rd1 permit · to 2004
- 129 Meadowvale Rd1 permit · to 2026
- 137 Meadowvale Rd2 permits · to 2017
- 145 Meadowvale Rd2 permits · to 2024
- 147 Meadowvale Rd8 permits · to 2020
- 150 Meadowvale Rd1 permit · to 2018
- 153 Meadowvale Rd2 permits · to 1999
- 154 Meadowvale Rd3 permits · to 2003
- 155 Meadowvale Rd2 permits · to 2001
- 159 Meadowvale Rd1 permit · to 1999
- 161 Meadowvale Rd1 permit · to 2008
- 169 Meadowvale Rd3 permits · to 2026
- 172 Meadowvale Rd1 permit · to 2016
- 198 Meadowvale Rd2 permits · to 2008
- 200 Meadowvale Rd1 permit · to 1999
- 229 Meadowvale Rd5 permits · to 2020
- 398 Meadowvale Rd12 permits · to 2008
- 413 Meadowvale Rd1 permit · to 2009
- 415 Meadowvale Rd1 permit · to 2013
- 418 Meadowvale Rd4 permits · to 2008
- 419 Meadowvale Rd1 permit · to 2010
- 421 Meadowvale Rd1 permit · to 2010
- 422 Meadowvale Rd2 permits · to 1995
- 423 Meadowvale Rd1 permit · to 2010
- 426 Meadowvale Rd3 permits · to 2007
- 435 Meadowvale Rd3 permits · to 2021
- 530 Meadowvale Rd2 permits · to 2022
- 538 Meadowvale Rd2 permits · to 2022
- 543 Meadowvale Rd1 permit · to 2011
- 544 Meadowvale Rd4 permits · to 2007
- 559 Meadowvale Rd8 permits · to 2019
- 563 Meadowvale Rd9 permits · to 2018
- 573 Meadowvale Rd9 permits · to 2003
- 575 Meadowvale Rd6 permits · to 2011
- 581 Meadowvale Rd1 permit · to 2014
- 582 Meadowvale Rd1 permit · to 2014
- 583 Meadowvale Rd1 permit · to 2000
- 586 Meadowvale Rd4 permits · to 2021
- 651 Meadowvale Rd1 permit · to 2014
- 726 Meadowvale Rd2 permits · to 2019
- 730 Meadowvale Rd3 permits · to 2025
- 732 Meadowvale Rd5 permits · to 2019
- 736 Meadowvale Rd2 permits · to 2024
- 745 Meadowvale Rd12 permits · to 2025
- 749 Meadowvale Rd1 permit · to 2017
- 750 Meadowvale Rd3 permits · to 2009
- 761 Meadowvale Rd7 permits · to 2023
- 812 Meadowvale Rd2 permits · to 2026
- 816 Meadowvale Rd5 permits · to 2026
- 828 Meadowvale Rd5 permits · to 2018
- 1365 Meadowvale Rd1 permit · to 2017
- 1381 Meadowvale Rd3 permits · to 2026
- 1749 Meadowvale Rd17 permits · to 2025
- 2000 Meadowvale Rd6 permits · to 2026
- 2259 Meadowvale Rd1 permit · to 2016
- 2264 Meadowvale Rd1 permit · to 2008
- 2270 Meadowvale Rd1 permit · to 2023
- 2271 Meadowvale Rd1 permit · to 2017
- 2274 Meadowvale Rd1 permit · to 2006