thepermitmap

Street · 784 of 8,516 by permit count

Building permits on Mallow Rd, North York

The City of Toronto has 230 building permits on record for Mallow Rd in North York, going back to 2000. Those permits created 7 homes and removed 0, a net change of +7. Declared construction value totals $4.7M. Half of the 227 permits issued here came through within 119 days of the application. The most recent permit was issued Oct 27, 2026 at 43 Mallow Rd.

Permits on record
2302000–2026
Declared construction value
$4.7Mas filed, not adjusted
Homes created
7dwelling units
Homes removed
0net +7
Typical wait
119 days92 days slower than the city

Permits issued per year

20002026 (part year)

Zoning

Most common zone
RD100.0% of permits · by-law 10.20
In detached-house zones
100.0%62.0% above the city’s 38.0%
Permits with a zone
31of 230 on record
  • Residential31 · 100%

The zoning categories the permits on Mallow Rd fall in, under Zoning By-law 569-2013. These are the City's own category names. This counts permits, not land: it says where the building work happened under which rules, not how the area is carved up. What each zone allows, and what gets built in it.

Other streets in M3B

Duncan Mill Rd431 permits
Scarsdale Rd353 permits
Lesmill Rd351 permits
Banbury Rd294 permits
Bond Ave202 permits
Larkfield Dr201 permits
Moatfield Dr177 permits
Berkinshaw Cres168 permits

Looking for one address on Mallow Rd? The address lookup shows every permit filed against a single house or building number.

Most recent permits

Issued Work What was filed Value Status
Oct 27, 2026 Addition(s) Revision No.1:Proposal to construct a new one-storey front addition, a two-storey west side addition, reconfigure/ rebuild roof over existing second storey and a new front covered porch. — Open
Oct 5, 2026 Building Permit Related(MS) Revision No.1:HVAC - Proposal to construct a new one-storey front addition, a two-storey west side addition, reconfigure/ rebuild roof over existing second storey and a new front covered porch. — Open
Jan 2, 2026 Building Permit Related (DR) Drain - Proposal to construct a new one-storey front addition, a two-storey west side addition, reconfigure/ rebuild roof over existing second storey and a new front covered porch. — Closed
Jan 2, 2026 Building Permit Related(PS) Plumbing - Proposal to construct a new one-storey front addition, a two-storey west side addition, reconfigure/ rebuild roof over existing second storey and a new front covered porch. — Open
Aug 10, 2023 Multiple Projects REV01: Proposed revision to change the existing garage roof.Proposal for a 2 storey rear addition, second storey addition to existing 1 storey dwelling; interior alterations, rear walkout, new porch and rear deck. See also 22 162733 ZAP. — Closed
Jul 24, 2023 Building Permit Related(MS) Rev 01: ductwork revisionHVAC - Proposal for a 2 storey rear addition, second storey addition to existing 1 storey dwelling; interior alterations, rear walkout, new porch and rear deck. See also 22 162733 ZAP. — Closed
Feb 2, 2023 Building Permit Related(PS) Plumbing - Proposal for a 2 storey rear addition, second storey addition to existing 1 storey dwelling; interior alterations, rear walkout, new porch and rear deck. See also 22 162733 ZAP. — Closed
Sep 9, 2022 Other(BA) Proposal to construct a new shade structure in the existing vacant space. $60K Closed
Jul 19, 2022 Underpinning Revision to basement underpinning — Closed
May 18, 2022 Multiple Projects Proposal for interior alteration, roof/ceiling alteration, and removal of the carport roof. $75K Closed
May 18, 2022 Building Permit Related(PS) Plumbing - Proposal for interior alteration, roof/ceiling alteration, and removal of the carport roof. — Closed
Feb 23, 2021 New Building REV 01 - Changes as per Bubbled Drawing Revision to add options: alternate kitchen, in-law suite MODEL # "MRLE" MODEL NAME "THE RUBY END" ELEVATION "CN" To construct three storey townhouses (6) with garage at grade (rear elevation) - Block 1 - Lot 1 — New build
Feb 23, 2021 New Building REV 01 - Changes as per Bubbled Drawing Revision to add options: alternate kitchen, in-law suite MODEL # "MRLE" MODEL NAME "THE RUBY END" ELEVATION "CN" To construct three storey townhouses (6) with garage at grade (rear elevation) - Block 1 - Lot 1 — New build
Feb 23, 2021 New Building REV 01 - Changes as per Bubbled Drawing Revision to add options: alternate kitchen, in-law suite MODEL # "MRLE" MODEL NAME "THE RUBY END" ELEVATION "CN" To construct three storey townhouses (6) with garage at grade (rear elevation) - Block 1 - Lot 1 — New build
Feb 23, 2021 New Building REV 01 - Changes as per Bubbled Drawing Revision to add options: alternate kitchen, in-law suite MODEL # "MRLE" MODEL NAME "THE RUBY END" ELEVATION "CN" To construct three storey townhouses (6) with garage at grade (rear elevation) - Block 1 - Lot 1 — New build
Feb 23, 2021 New Building REV 01 - Changes as per Bubbled Drawing Revision to add options: alternate kitchen, in-law suite MODEL # "MRLE" MODEL NAME "THE RUBY END" ELEVATION "CN" To construct three storey townhouses (6) with garage at grade (rear elevation) - Block 1 - Lot 1 — New build
Feb 17, 2021 New Building REVISION - to modify the porch steps at the frontMODEL # "B28E" MODEL NAME "THE PEARL MO" - LOT 4To construct three storey dwelling with intergral garage — New build
Feb 8, 2021 New Building Revision 01 - 3 piece rough inMODEL # "MRLA" MODEL NAME "THE AQUAMARINE" ELEVATION "CN" To construct three storey townhouses (7) with garage at grade (rear elevation) - Block 2 - Lot 9 — New build
Feb 8, 2021 New Building Revision 01 - add cold cellar, 3pc rough-in and in-law suiteMODEL # "MRLC" MODEL NAME "THE OPAL" ELEVATION "CN" To construct three storey townhouses (7) with garage at grade (rear elevation) - Block 2 - Lot 8 — New build
Feb 8, 2021 New Building Revision 01 - add options: 3pc rough in, in law suite, optional double sinksMODEL # "MRLB" MODEL NAME "THE EMERALD CORNER" ELEVATION "MO" To construct three storey townhouses (7) with garage at grade (rear elevation) - Block 5 - Lot 33 — New build
Feb 8, 2021 New Building Revision 01 - add options: 3pc rough inMODEL # "MRLC" MODEL NAME "THE OPAL" ELEVATION "MO" To construct three storey townhouses (7) with garage at grade (rear elevation) - Block 5 - Lot 32 — New build
Feb 8, 2021 New Building Revision 01 - add options: 3pc rough in, bath oasisMODEL # "MRLA" MODEL NAME "THE AQUAMARINE" ELEVATION "MO" To construct three storey townhouses (7) with garage at grade (rear elevation) - Block 5 - Lot 31 — New build
Feb 8, 2021 New Building Revision 01 - add options: 3pc rough in, cold cellarMODEL # "MRLA" MODEL NAME "THE AQUAMARINE" ELEVATION "MO" To construct three storey townhouses (7) with garage at grade (rear elevation) - Block 5 - Lot 30 — New build
Feb 8, 2021 New Building Revision 01 - add options: 3pc rough in, in law suiteMODEL # "MRLC" MODEL NAME "THE OPAL" ELEVATION "MO" To construct three storey townhouses (7) with garage at grade (rear elevation) - Block 5 - Lot 29 — New build
Feb 8, 2021 New Building Revision 01 - add options: in law suite, bath oasisMODEL # "MRLE" MODEL NAME "THE RUBY END" ELEVATION "CN" To construct three storey townhouses (7) with garage at grade (rear elevation) - Block 4 - Lot 27 — New build
Feb 8, 2021 New Building Revision 01 - add options: 3pc rough in, bath oasisMODEL # "MRLA" MODEL NAME "THE AQUAMARINE" ELEVATION "CN" To construct three storey townhouses (7) with garage at grade (rear elevation) - Block 4 - Lot 26 — New build
Feb 8, 2021 New Building Revision 01 - add options: 3pc rough in, alternate kitchenMODEL # "MRLD" MODEL NAME "THE RUBY" ELEVATION "CN" To construct three storey townhouses (7) with garage at grade (rear elevation) - Block 4 - Lot 25 — New build
Feb 8, 2021 New Building Revision 01 - add options: in-law suiteMODEL # "MRLD" MODEL NAME "THE RUBY" ELEVATION "CN" To construct three storey townhouses (7) with garage at grade (rear elevation) - Block 4 - Lot 24 — New build
Feb 8, 2021 New Building Revision 01 - add options: 3pc rough inMODEL # "MRLA" MODEL NAME "THE AQUAMARINE" ELEVATION "CN" To construct three storey townhouses (7) with garage at grade (rear elevation) - Block 4 - Lot 23 — New build
Feb 8, 2021 New Building Revision 01 - add options cold cellar, 3 pc rough in, in-law suiteMODEL # "MRLC" MODEL NAME "THE OPAL" ELEVATION "CN" To construct three storey townhouses (7) with garage at grade (rear elevation) - Block 4 - Lot 22 — New build
Feb 8, 2021 New Building Revision 01 - add options: 3 pc rough-in, in-law suite MODEL # "MRLB" MODEL NAME "THE EMERALD CORNER" ELEVATION "MO" To construct three storey townhouses (7) with garage at grade (rear elevation) - Block 3 - Lot 20 — New build
Feb 8, 2021 New Building Revision 01 - add options: 3 pc rough-in, stacked washer/dryerMODEL # "MRLC" MODEL NAME "THE OPAL" ELEVATION "MO" To construct three storey townhouses (7) with garage at grade (rear elevation) - Block 3 - Lot 19 — New build
Feb 8, 2021 New Building Revision 01 - add options: 3 pc rough-in, in-law suite, bath oasisMODEL # "MRLC" MODEL NAME "THE OPAL" ELEVATION "MO" To construct three storey townhouses (7) with garage at grade (rear elevation) - Block 3 - Lot 18 — New build
Feb 8, 2021 New Building Revision 01 - add options: 3 pc rough-in, in-law suite MODEL # "MRLA" MODEL NAME "THE AQUAMARINE" ELEVATION "MO" To construct three storey townhouses (7) with garage at grade (rear elevation) - Block 3 - Lot 17 — New build
Feb 8, 2021 New Building Revision 01 - add options: 3 pc rough-in, in-law suite MODEL # "MRLC" MODEL NAME "THE OPAL" ELEVATION "MO" To construct three storey townhouses (7) with garage at grade (rear elevation) - Block 3 - Lot 16 — New build
Feb 8, 2021 New Building Revision 01 - Model # "MRLD# Model Name "The Ruby" Elevation "MO STD"MODEL # "MRLD" MODEL NAME "THE RUBY" ELEVATION "MO" To construct three storey townhouses (7) with garage at grade (rear elevation) - Block 3 - Lot 15 — New build
Feb 8, 2021 New Building Revision 01 - add options: cold cellar, alternate kitchen and in-law suite and superMODEL # "MRLE" MODEL NAME "THE RUBY END" ELEVATION "CN" To construct three storey townhouses (7) with garage at grade (rear elevation) - Block 2 - Lot 13 — New build
Feb 8, 2021 New Building Revision 01- add options: cold cellar, 3 pc rough-in, in-law suite and super showerMODEL # "MRLA" MODEL NAME "THE AQUAMARINE" ELEVATION "CN" To construct three storey townhouses (7) with garage at grade (rear elevation) - Block 2 - Lot 12 — New build
Feb 8, 2021 New Building Revision 01- add options: cold cellar, 3 pc rough-in, in-law suite and bath oasisMODEL # "MRLD" MODEL NAME "THE RUBY" ELEVATION "CN" To construct three storey townhouses (7) with garage at grade (rear elevation) - Block 2 - Lot 11 — New build
Feb 8, 2021 New Building Revision 01 - add options: 3 pc rough in, alternate kitchen and in-law suiteMODEL # "MRLD " MODEL NAME "THE RUBY" ELEVATION "CN" To construct three storey townhouses (7) with garage at grade (rear elevation) - Block 2 - Lot 10 — New build

The 40 most recent of 230 permits on record. Figures come from the City’s active and cleared permit datasets, refreshed daily — what that covers, and what it misses.

Every address on Mallow Rd with a permit on record · 10

  • 4 Mallow Rd4 permits · to 2022
  • 6 Mallow Rd1 permit · to 2000
  • 12 Mallow Rd4 permits · to 2015
  • 15 Mallow Rd199 permits · to 2022
  • 43 Mallow Rd5 permits · to 2026
  • 48 Mallow Rd2 permits · to 2017
  • 50 Mallow Rd5 permits · to 2018
  • 51 Mallow Rd2 permits · to 2012
  • 52 Mallow Rd7 permits · to 2023
  • 54 Mallow Rd1 permit · to 2001
Source
City of Toronto Open Data
Dataset
Building permits, active + cleared
Records
230
Data through
2026-10-27
Refresh
Daily from the City
Sheet
STR-309