Street · 641 of 8,516 by permit count
Building permits on Humewood Dr, York
The City of Toronto has 272 building permits on record for Humewood Dr in York, going back to 1988. Those permits created 11 homes and removed 3, a net change of +8. Declared construction value totals $6.8M. Half of the 265 permits issued here came through within 15 days of the application. The most recent permit was issued Nov 24, 2025 at 168 Humewood Dr.
- Permits on record
- 2721988–2025
- Declared construction value
- $6.8Mas filed, not adjusted
- Homes created
- 11dwelling units
- Homes removed
- 3net +8
- Typical wait
- 15 days12 days faster than the city
Permits issued per year
Zoning
- Most common zone
- RM93.3% of permits · by-law 10.80
- In detached-house zones
- 3.7%34.2% below the city’s 38.0%
- Permits with a zone
- 267of 272 on record
The zoning categories the permits on Humewood Dr fall in, under Zoning By-law 569-2013. These are the City's own category names. This counts permits, not land: it says where the building work happened under which rules, not how the area is carved up. What each zone allows, and what gets built in it.
Most common work
Structures worked on
Postal areas
Other streets in M6C
Looking for one address on Humewood Dr? The address lookup shows every permit filed against a single house or building number.
Most recent permits
| Issued | Work | What was filed | Value | Status |
|---|---|---|---|---|
| Nov 24, 2025 | Addition(s) | Proposal to enclose front porch | $10K | Open |
| Aug 15, 2025 | Deck | Proposal for new deck in backyward | $50K | Closed |
| Aug 12, 2025 | Canopy | Proposal for replacing existing front porch roof canopy with a flat roof | $3K | Open |
| Aug 1, 2025 | Deck | Proposal for deck | $50K | Closed |
| Jun 6, 2025 | Building Permit Related(MS) | Rev 01 - replace existing boiler system with new forced air gas furnace to include new addition.HVAC - To construct ground floor addition and powder room on main floor | — | Open |
| Nov 28, 2024 | Building Permit Related(PS) | REVISION 01: Add a powder room Ground floorPlumbing - interior alterations to all floors and new deck at rear. | — | Open |
| Oct 22, 2024 | Multiple Projects | To construct ground floor addition and powder room on main floor | $40K | Open |
| Oct 22, 2024 | Building Permit Related(PS) | Plumbing - To construct ground floor addition and powder room on main floor | — | Open |
| Aug 27, 2024 | Multiple Projects | REVISION 01: rear deck [interior alterations to all floors and new deck at rear.] | — | Closed |
| Jun 17, 2024 | Building Permit Related(MS) | HVAC - interior alterations to all floors and new deck at rear. | — | Open |
| May 21, 2024 | Back Water Valve (Sewer only) | Supply and Install BWV | — | Closed |
| Feb 27, 2024 | Building Permit Related(MS) | HVAC - Proposing to demolish the existing garage and construct a new 2-storey garden suite located at the rear yard of the existing house. | — | Closed |
| Nov 28, 2023 | Sign Building Permit Related | install 1 electronic first party sign | — | Closed |
| Jun 5, 2023 | Building Permit Related (DR) | Drain - Proposing to demolish the existing garage and construct a new 2-storey garden suite located at the rear yard of the existing house. | — | Closed |
| Jun 5, 2023 | New Laneway / Rear Yard Suite | Proposing to demolish the existing garage and construct a new 2-storey garden suite located at the rear yard of the existing house. | $500K | Closed |
| Jun 5, 2023 | Building Permit Related(PS) | Plumbing - Proposing to demolish the existing garage and construct a new 2-storey garden suite located at the rear yard of the existing house. | — | Closed |
| Jan 3, 2023 | Interior Alterations | Proposed work required to comply with approved Life Safety Study ( attached ) by the Toronto Fire Department includes adding detection devices to the fire Alarm system, and upgrading Door Assemblies to 45 min Fire rated. | $25K | Closed |
| Dec 9, 2022 | Boiler/Furnace: SFD/Semi/TH | Proposed radiant floor heating in basement and basement heater for 1st floor addition | $20K | Closed |
| Jul 20, 2022 | Building Permit Related (DR) | Drain - Proposed underpinning,rear foundation wall removal, structural upgrade and a new side window in basement. | — | Closed |
| Jul 20, 2022 | Multiple Projects | Proposed underpinning,rear foundation wall removal, structural upgrade and a new side window in basement. | $30K | Closed |
| Jul 20, 2022 | Building Permit Related(PS) | Plumbing - Proposed underpinning,rear foundation wall removal, structural upgrade and a new side window in basement. | — | Closed |
| Apr 14, 2022 | Addition(s) | REV 02: Minor revision to interior layout and previously approved plans.REV 01 - Changes as per bubbled drawings. Construct an addition at the third storey level. | — | Closed |
| Feb 9, 2022 | Building Permit Related(MS) | HVAC - Proposal to construct a 2 storey rear addition, interior alterations and a rear deck on the existing single family dwelling. | — | Closed |
| Feb 1, 2022 | Building Permit Related(MS) | HVAC - To construct a rear three storey addition, interior alterations including rear yard deck | — | Closed |
| Dec 14, 2021 | Building Permit Related(PS) | Plumbing - Proposal to construct a 2 storey rear addition, interior alterations and a rear deck on the existing single family dwelling. | — | Closed |
| Dec 8, 2021 | Multiple Projects | Revision 01. Side yard retaining wall and landscapeProposal for new additions and interior alterations, underpinning | — | Closed |
| Nov 23, 2021 | Multiple Projects | To construct a rear three storey addition, interior alterations including rear yard deck and front porch | $1.2M | Closed |
| Nov 23, 2021 | Building Permit Related(PS) | Plumbing - To construct a rear three storey addition, interior alterations including rear yard deck | — | Closed |
| Nov 1, 2021 | Building Permit Related(MS) | Rev 1: Changing form furnace to a ductless heating systemHVAC -Proposal to construct a third storey addition and create 1 additional dwelling unit | — | Closed |
| Oct 12, 2021 | Multiple Projects | Proposal to construct a second floor rear addition and interior alterations to the existing single family dwelling. | $50K | Closed |
| Oct 12, 2021 | Building Permit Related(PS) | Plumbing - construct 2nd floor addition at rear, interior alterations | — | Closed |
| Sep 29, 2021 | Building Permit Related(PS) | Plumbing - Proposal to construct a third storey addition and create 1 additional dwelling unit | — | Closed |
| Jul 7, 2021 | Building Permit Related(MS) | HVAC - Proposed third storey addition, rear two storey addition, interior alterations, new deck, new front porch, and basement walkout to an existing single family semi-detached dwelling. Scope of work includes underpinning. | — | Closed |
| Jun 10, 2021 | Building Permit Related (DR) | Drain - PROP. 3RD STOREY ADDITION & REAR 2 STOREY EXTENSION WITH UNDERPINING 31.62M (BSMT AREA 80.55M2) | — | Closed |
| Jun 10, 2021 | Multiple Projects | Proposed third storey addition, rear two storey addition, interior alterations, new deck, new front porch, and basement walkout to an existing single family semi-detached dwelling. Scope of work includes underpinning. | $300K | Closed |
| Jun 10, 2021 | Party Wall Admin Permits | Admin permit for work being completed at 109 Humewood Dr | — | Closed |
| Jun 10, 2021 | Building Permit Related(PS) | Plumbing - PROP. 3RD STOREY ADDITION & REAR 2 STOREY EXTENSION WITH UNDERPINING 31.62M (BSMT AREA 80.55M2) | — | Closed |
| Apr 22, 2021 | New Building | REVISION#1: REVISED FIRST FLOOR ELEVATION HEIGHT AND BUILDING HEIGHT ELEVATION.Proposal to construct a new two storey single family dwelling with a finished basement | — | New build |
| Apr 21, 2021 | Multiple Projects | Rev 01 - Proposed structural changes to reinforcing existing concrete slab, sistering existing joists, roof bracing, existing canopy to remain.existing steel beam in basement to remain, existing basement north window to be infilled to accomodate ductwork, and changes to baserment washroom layout. | — | Closed |
| Mar 25, 2021 | Building Permit Related (DR) | Drain - Proposal for new additions and interior alterations, underpinning | — | Closed |
The 40 most recent of 272 permits on record. Figures come from the City’s active and cleared permit datasets, refreshed daily — what that covers, and what it misses.
Every address on Humewood Dr with a permit on record · 68
- 2 Humewood Dr8 permits · to 2020
- 3 Humewood Dr2 permits · to 2014
- 6 Humewood Dr6 permits · to 2022
- 7 Humewood Dr6 permits · to 2019
- 8 Humewood Dr7 permits · to 2024
- 9 Humewood Dr6 permits · to 2023
- 10 Humewood Dr3 permits · to 2015
- 11 Humewood Dr1 permit · to 2017
- 12 Humewood Dr2 permits · to 2010
- 14 Humewood Dr7 permits · to 2010
- 15 Humewood Dr2 permits · to 2016
- 18 Humewood Dr3 permits · to 2018
- 19 Humewood Dr8 permits · to 2012
- 20 Humewood Dr1 permit · to 2005
- 21 Humewood Dr1 permit · to 2001
- 22 Humewood Dr5 permits · to 2010
- 23 Humewood Dr1 permit · to 2012
- 24 Humewood Dr1 permit · to 2020
- 25 Humewood Dr3 permits · to 2011
- 27 Humewood Dr1 permit · to 2000
- 30 Humewood Dr3 permits · to 2012
- 40 Humewood Dr20 permits · to 2023
- 55 Humewood Dr5 permits · to 2017
- 56 Humewood Dr5 permits · to 2017
- 57 Humewood Dr5 permits · to 2017
- 63 Humewood Dr3 permits · to 2022
- 64 Humewood Dr3 permits · to 2016
- 65 Humewood Dr3 permits · to 2018
- 67 Humewood Dr1 permit · to 2003
- 68 Humewood Dr6 permits · to 2021
- 69 Humewood Dr5 permits · to 2009
- 70 Humewood Dr9 permits · to 2021
- 72 Humewood Dr1 permit · to 2008
- 73 Humewood Dr1 permit · to 2009
- 74 Humewood Dr5 permits · to 2025
- 75 Humewood Dr4 permits · to 2024
- 77 Humewood Dr8 permits · to 2012
- 103 Humewood Dr1 permit · to 2020
- 105 Humewood Dr2 permits · to 2006
- 107 Humewood Dr2 permits · to 2016
- 109 Humewood Dr4 permits · to 2021
- 111 Humewood Dr5 permits · to 2021
- 113 Humewood Dr7 permits · to 2018
- 115 Humewood Dr4 permits · to 2018
- 117 Humewood Dr4 permits · to 2013
- 139 Humewood Dr2 permits · to 2010
- 141 Humewood Dr1 permit · to 2000
- 143 Humewood Dr7 permits · to 2020
- 145 Humewood Dr4 permits · to 2017
- 151 Humewood Dr3 permits · to 2015
- 153 Humewood Dr3 permits · to 2011
- 155 Humewood Dr9 permits · to 2017
- 156 Humewood Dr3 permits · to 2009
- 160 Humewood Dr1 permit · to 2020
- 161 Humewood Dr1 permit · to 2008
- 163 Humewood Dr1 permit · to 2019
- 164 Humewood Dr3 permits · to 2018
- 168 Humewood Dr8 permits · to 2025
- 170 Humewood Dr7 permits · to 2022
- 173 Humewood Dr9 permits · to 2020
- 175 Humewood Dr1 permit · to 2006
- 176 Humewood Dr6 permits · to 2018
- 178 Humewood Dr3 permits · to 2017
- 179 Humewood Dr6 permits · to 2021
- 180 Humewood Dr3 permits · to 2017
- 184 Humewood Dr1 permit · to 2003
- 186 Humewood Dr4 permits · to 2021
- 203 Humewood Dr6 permits · to 2015