Street · 3111 of 8,516 by permit count
Building permits on Gordon St
The City of Toronto has 54 building permits on record for Gordon St, going back to 1993. Declared construction value totals $1.1M. Half of the 52 permits issued here came through within 7 days of the application. The most recent permit was issued Oct 29, 2025 at 44 Gordon St.
- Permits on record
- 541993–2025
- Declared construction value
- $1.1Mas filed, not adjusted
- Homes created
- 0dwelling units
- Homes removed
- 0net +0
- Typical wait
- 7 days20 days faster than the city
Permits issued per year
Zoning
- Most common zone
- R100.0% of permits · by-law 10.10
- In detached-house zones
- 0.0%38.0% below the city’s 38.0%
- Permits with a zone
- 54of 54 on record
The zoning categories the permits on Gordon St fall in, under Zoning By-law 569-2013. These are the City's own category names. This counts permits, not land: it says where the building work happened under which rules, not how the area is carved up. What each zone allows, and what gets built in it.
Most common work
Structures worked on
Postal areas
Other streets in M6K
Looking for one address on Gordon St? The address lookup shows every permit filed against a single house or building number.
Most recent permits
| Issued | Work | What was filed | Value | Status |
|---|---|---|---|---|
| Oct 29, 2025 | Alter: Add on /Ductwork | Proposed work includes the removal of existing ductwork and installation of new ducts throughout the basement, first floor, and second floor. In the attic room, the old ducts will be removed and replaced with a new ductless heating and cooling system. The scope of work will also require cutting, pat | $30K | Closed |
| Sep 6, 2024 | Building Permit Related(MS) | HVAC - Proposed construction of:1. REAR ADDITION (16.41 sq.m), 2. THIRD FLOOR ADDITION (59.75 sq.m), 3. UNDERPINNING (39.21 l.m); 4. INTERIOR ALTERATIONS (basement: 60 sq.m; ground: 60 sq.m; 2nd floor: 50 sq.m), 5. FRONT PORCH RENOVATION | — | Closed |
| Dec 6, 2023 | Building Permit Related (DR) | Drain - Proposed construction of:1. REAR ADDITION (16.41 sq.m), 2. THIRD FLOOR ADDITION (59.75 sq.m), 3. UNDERPINNING (39.21 l.m); 4. INTERIOR ALTERATIONS (basement: 60 sq.m; ground: 60 sq.m; 2nd floor: 50 sq.m), 5. FRONT PORCH RENOVATION | — | Closed |
| Nov 29, 2023 | Party Wall Admin Permits | Party wall admin permit for shared wall with 25 Gordon St - #23 133969 BLD 00 SR | — | Closed |
| Nov 10, 2023 | Multiple Projects | Proposed construction of:1. REAR ADDITION (16.41 sq.m), 2. THIRD FLOOR ADDITION (59.75 sq.m), 3. UNDERPINNING (39.21 l.m); 4. INTERIOR ALTERATIONS (basement: 60 sq.m; ground: 60 sq.m; 2nd floor: 50 sq.m), 5. FRONT PORCH RENOVATION | $400K | Closed |
| Nov 10, 2023 | Building Permit Related(PS) | Plumbing - Proposed construction of:1. REAR ADDITION (16.41 sq.m), 2. THIRD FLOOR ADDITION (59.75 sq.m), 3. UNDERPINNING (39.21 l.m); 4. INTERIOR ALTERATIONS (basement: 60 sq.m; ground: 60 sq.m; 2nd floor: 50 sq.m), 5. FRONT PORCH RENOVATION | — | Closed |
| Jun 29, 2021 | Party Wall Admin Permits | Party Wall permit related to 17 Gordon St (21 167265) | — | Closed |
| Jun 29, 2021 | Party Wall Admin Permits | Party Wall permit related to 17 Gordon St | — | Closed |
| Jun 29, 2021 | Building Permit Related(PS) | Plumbing - Proposed interior alterations to first and second floor of existing Single Family Dwelling | — | Open |
| Jun 29, 2021 | Interior Alterations | Proposed interior alterations to first and second floor of existing Single Family Dwelling | $400K | Open |
| Jun 29, 2021 | Building Permit Related(MS) | HVAC - Proposed interior alterations to first and second floor of existing Single Family Dwelling | — | Open |
| Jan 27, 2020 | Building Permit Related (DR) | Drain - Proposal to construct a rear 2nd floor addition to existing sfd-townhouse. | — | Closed |
| Oct 18, 2019 | Multiple Projects | REVISION - to rear addition as per the drawingsProposal to construct a rear 2nd floor addition to existing sfd-townhouse. | — | Closed |
| Nov 27, 2018 | Party Wall Admin Permits | Party wall admin permit in conjunction with 18 233144 BLD at 17 Gordon St. | — | Open |
| Nov 27, 2018 | Multiple Projects | Proposed interior alterations and underpinning in the basement of an existing single family detached dwelling. | $100K | Open |
| Nov 27, 2018 | Building Permit Related(PS) | Plumbing - Proposed interior alterations and underpinning in the basement of an existing single family detached dwelling. | — | Open |
| Nov 27, 2018 | Building Permit Related(MS) | HVAC - Proposed interior alterations and underpinning in the basement of an existing single family detached dwelling. | — | Open |
| Nov 27, 2018 | Party Wall Admin Permits | Party wall admin permit in conjunction with 18 233144 BLD at 17 Gordon St. | — | Open |
| Jun 6, 2017 | Underpinning | Revision to include basement walkout at rear. | — | Open |
| Jun 1, 2017 | Back Water Valve (Sewer only) | Proposal to install a back water valve | — | Closed |
| Mar 29, 2017 | Canopy | Proposed construction of a canopy in the side yard to existing single family dwelling. | $2K | Closed |
| May 24, 2016 | Back Water Valve (Sewer only) | Back Water Valve (Sewer only) installation. | — | Closed |
| Feb 1, 2016 | Back Water Valve (Sewer only) | Install one backwater valve. | — | Closed |
| Jul 15, 2015 | Garage | Proposed detached Garage behind the existing House. | $30K | Closed |
| Sep 25, 2013 | Back Water Valve (Sewer only) | Installation of one 4" full port backwater valve on main line | $3K | Closed |
| Jan 22, 2013 | Addition(s) | Proposal for a one-storey unheated enclosure to both the entry to basement and the side entrance (west side) of existing semi-detached sfd | $2K | Closed |
| Jun 21, 2012 | Interior Alterations | proposed interior alterations to the main floor | $6K | Closed |
| Nov 10, 2010 | New Building | Revision to existing building permit - revision to add new third floor to existing new house - see 09 107599 ZAL, and 09 113306 MV and 10 150242 MV for PAL and C of A's.Permit to construct new sfd townhouse. (interior alterations additions, replacing floor joists on ground and second floor) | — | New build |
| Nov 4, 2010 | Building Permit Related(MS) | HVAC - Permit to construct new sfd townhouse. (interior alterations additions, replacing floor joists on ground and second floor) | — | Open |
| Sep 13, 2010 | Building Permit Related(PS) | Plumbing - Interior alterations to remove non loadbearing walls at the first floor, and to create new openings in the rear wall | — | Closed |
| May 20, 2010 | Building Permit Related(MS) | HVAC - Proposed interior alterations to basement, ground floor, and second floor. | — | Closed |
| Apr 27, 2010 | Interior Alterations | ADMIN TO 21 GORDON ST. | — | Open |
| Apr 26, 2010 | Interior Alterations | ADMIN TO 21 GORDON ST. | — | Closed |
| Apr 26, 2010 | Interior Alterations | Proposed interior alterations to basement, ground floor, and second floor. | $30K | Closed |
| Apr 26, 2010 | Building Permit Related(PS) | Plumbing - Proposed interior alterations to basement, ground floor, and second floor. | — | Closed |
| Dec 3, 2009 | Garage | Construct rear detatched garage, connected to 19 Gordon St new rear detatched garage by party wall. | $20K | Closed |
| Dec 3, 2009 | Garage | Construct rear detatched garage, connected to 17 Gordon St new rear detatched garage by party wall. | $20K | Closed |
| Mar 17, 2009 | Interior Alterations | Interior alterations to remove non loadbearing walls at the first floor, and to create new openings in the rear wall | $30K | Closed |
| Oct 24, 2008 | Demolition | Substantial demolition of SFD rowhouse. | — | Demolition |
| Oct 24, 2008 | Building Permit Related(PS) | Plumbing - Permit to construct new sfd townhouse. (interior alterations additions, replacing floor joists on ground and second floor) | — | Open |
The 40 most recent of 54 permits on record. Figures come from the City’s active and cleared permit datasets, refreshed daily — what that covers, and what it misses.
Every address on Gordon St with a permit on record · 18
- 4 Gordon St3 permits · to 2008
- 8 Gordon St1 permit · to 2012
- 9 Gordon St1 permit · to 1995
- 10 Gordon St1 permit · to 1995
- 11 Gordon St2 permits · to 2020
- 12 Gordon St2 permits · to 2010
- 15 Gordon St3 permits · to 2021
- 16 Gordon St5 permits · to 2017
- 17 Gordon St9 permits · to 2021
- 18 Gordon St1 permit · to 1993
- 19 Gordon St8 permits · to 2021
- 21 Gordon St3 permits · to 2010
- 23 Gordon St3 permits · to 2023
- 25 Gordon St4 permits · to 2024
- 31 Gordon St2 permits · to 2017
- 42 Gordon St1 permit · to 2016
- 44 Gordon St1 permit · to 2025
- 46 Gordon St4 permits · to 2017