Street · 2134 of 8,516 by permit count
Building permits on Glenside Ave
The City of Toronto has 89 building permits on record for Glenside Ave, going back to 1996. Those permits created 10 homes and removed 5, a net change of +5. Declared construction value totals $3.9M. Half of the 81 permits issued here came through within 20 days of the application. The most recent permit was applied for Oct 16, 2026 at 52 Glenside Ave.
- Permits on record
- 891996–2026
- Declared construction value
- $3.9Mas filed, not adjusted
- Homes created
- 10dwelling units
- Homes removed
- 5net +5
- Typical wait
- 20 days7 days faster than the city
Permits issued per year
Zoning
- Most common zone
- R100.0% of permits · by-law 10.10
- In detached-house zones
- 0.0%38.0% below the city’s 38.0%
- Permits with a zone
- 89of 89 on record
The zoning categories the permits on Glenside Ave fall in, under Zoning By-law 569-2013. These are the City's own category names. This counts permits, not land: it says where the building work happened under which rules, not how the area is carved up. What each zone allows, and what gets built in it.
Most common work
Structures worked on
Postal areas
Other streets in M4L
Looking for one address on Glenside Ave? The address lookup shows every permit filed against a single house or building number.
Most recent permits
| Issued | Work | What was filed | Value | Status |
|---|---|---|---|---|
| Oct 16, 2026 | Building Permit Related (DR) | Drain - PROPOSED NEW CONSTRUCTION SIXPLEX (BASEMENT+3 STOREY) | — | Open |
| Oct 16, 2026 | Building Permit Related(PS) | Plumbing - PROPOSED NEW CONSTRUCTION SIXPLEX (BASEMENT+3 STOREY) | — | Open |
| Oct 16, 2026 | Demolition | Demolition of the existing single-family dwelling (SFD) and construction of a six-unit residential building. | — | Demolition |
| Oct 16, 2026 | New Building | PROPOSED NEW CONSTRUCTION SIXPLEX (BASEMENT+3 STOREY) | $1.0M | New build |
| Aug 28, 2026 | New Laneway / Rear Yard Suite | Alteration of existing garage to detached ADU (additional dwelling unit) - Laneway | $50K | Open |
| May 25, 2026 | Building Permit Related(MS) | HVAC - Proposal for interior alteration in the basement.- PROPOSED 2 UNIT DWELLING | — | Closed |
| May 21, 2026 | Interior Alterations | Revision 01: Revision to permit (as bubbled)Proposal for interior alteration in the basement.- PROPOSED 2 UNIT DWELLING | $40K | Closed |
| Mar 30, 2026 | Demolition | Demolition of the existing one storey building and constructing a new detached house. | — | Demolition |
| Mar 9, 2026 | Building Permit Related (DR) | Drain - To construct a new two-and-one-half-storey detached dwelling with a front integral garage, a rear ground floor deck, a front second storey balcony, a front third floor patio on the roof of the second storey below, and a side and rear (southwest) third floor rooftop terrace. The existing rear | — | Open |
| Mar 9, 2026 | Building Permit Related(PS) | Plumbing - To construct a new two-and-one-half-storey detached dwelling with a front integral garage, a rear ground floor deck, a front second storey balcony, a front third floor patio on the roof of the second storey below, and a side and rear (southwest) third floor rooftop terrace. The existing r | — | Open |
| Mar 9, 2026 | Building Permit Related(MS) | HVAC - To construct a new two-and-one-half-storey detached dwelling with a front integral garage, a rear ground floor deck, a front second storey balcony, a front third floor patio on the roof of the second storey below, and a side and rear (southwest) third floor rooftop terrace. The existing rear | — | Open |
| Mar 9, 2026 | New Building | To construct a new two-and-one-half-storey detached dwelling with a front integral garage, a rear ground floor deck, a front second storey balcony, a front third floor patio on the roof of the second storey below, and a side and rear (southwest) third floor rooftop terrace. The existing rear detache | $1.1M | New build |
| Nov 19, 2025 | Building Permit Related (DR) | Drain - Proposal for interior alteration in the basement. | — | Closed |
| Nov 19, 2025 | Building Permit Related(PS) | Plumbing - Proposal for interior alteration in the basement. | — | Closed |
| Sep 5, 2025 | Interior Alterations | PROPOSED INTERIOR ALTERATIONS TO REMOVE LOAD BEARING WALLS ON THE 1ST FLOOR AND BASEMENT ALTERATION. | $28K | Open |
| Sep 5, 2025 | Building Permit Related(PS) | Plumbing - PROPOSED INTERIOR ALTERATIONS TO REMOVE LOAD BEARING WALLS ON THE 1ST FLOOR AND BASEMENT ALTERATION. | — | Open |
| Aug 28, 2025 | Interior Alterations | Application withdrawn - submitted drawings show lack of structural information and AREC not provided.Proposed alterations, removal of load bearing walls on the first floor and interior alterations to the basement. | $28K | Closed |
| Aug 28, 2025 | Building Permit Related(PS) | Plumbing - Proposed alterations, removal of load bearing walls on the first floor and interior alterations to the basement. | — | Closed |
| Jun 7, 2024 | Building Permit Related(PS) | REV 01: Change to basement layout to include bar sinkPlumbing - Proposal to demolish existing SFD and construct 2 new 2 storey SFD- Part 2 | — | Closed |
| Jun 7, 2024 | Building Permit Related(PS) | REV 01: Change to basement layout to include bar sinkPlumbing - Proposal to demolish existing SFD and construct 2 new 2 storey SFD- Part 1 | — | Closed |
| Apr 12, 2024 | Back Water Valve (Sewer only) | Proposal to install a back water valve | — | Closed |
| Mar 29, 2023 | Interior Alterations | Interior alterations to remove existing non-load bearing partion wall, add new partition and add new furnance and duct | $180K | Closed |
| Mar 29, 2023 | Building Permit Related(MS) | HVAC - Interior alterations to remove existing non-load bearing partion wall, add new partition and add new furnance and duct | — | Closed |
| Oct 26, 2022 | Garage | TO CONSTRUCT A 1 STOREY GARAGE IN THE REAR YARD ACCESSED BY A SHARED DRIVE | $20K | Closed |
| Jun 22, 2022 | Building Permit Related(MS) | HVAC - Proposal for 2nd floor addition and alteration at the one-storey SFD. | — | Closed |
| Jun 8, 2022 | Multiple Projects | Proposal for 2nd floor addition and alteration at the one-storey SFD. | $132K | Closed |
| Jun 8, 2022 | Building Permit Related(PS) | Plumbing - Proposal for 2nd floor addition and alteration at the one-storey SFD. | — | Closed |
| May 12, 2022 | New Building | Rev 1: CHANGE DIMENSIONS OF WINDOW AT REAR.Proposal to demolish existing SFD and construct 2 new 2 storey SFD- Part 1 | — | New build |
| Mar 8, 2022 | Back Water Valve (Sewer only) | bwv installation | — | Closed |
| Nov 23, 2021 | Demolition | Proposal to demolish existing SFD and construct 2 new 2 storey SFD | — | Demolition |
| Oct 21, 2021 | Building Permit Related (DR) | Drain - Proposal to demolish existing SFD and construct 2 new 2 storey SFD- Part 2 | — | Closed |
| Oct 21, 2021 | New Building | Proposal to demolish existing SFD and construct 2 new 2 storey SFD- Part 2 | $450K | New build |
| Oct 21, 2021 | Building Permit Related(MS) | HVAC - Proposal to demolish existing SFD and construct 2 new 2 storey SFD- Part 2 | — | Closed |
| Oct 19, 2021 | Building Permit Related (DR) | Drain - Proposal to demolish existing SFD and construct 2 new 2 storey SFD- Part 1 | — | Closed |
| Oct 19, 2021 | Building Permit Related(MS) | HVAC - Proposal to demolish existing SFD and construct 2 new 2 storey SFD- Part 1 | — | Closed |
| Sep 7, 2021 | Multiple Projects | Proposal for interior alterations and a new basement walkout at the front of an existing 1 storey SFD-detached dwelling. | $100K | Closed |
| Sep 7, 2021 | Building Permit Related(PS) | Plumbing - Proposal for interior alterations and a new basement walkout at the front of an existing 1 storey SFD-detached dwelling. | — | Closed |
| Sep 7, 2021 | Building Permit Related(MS) | HVAC - Proposal for interior alterations and a new basement walkout at the front of an existing 1 storey SFD-detached dwelling. | — | Closed |
| May 13, 2021 | Building Permit Related (DR) | Drain - Proposal to construct a new full second storey addition and interior alterations to the existing ground floor level.. **** See C of A Decision **** | — | Closed |
| May 4, 2021 | Multiple Projects | Proposal to construct a new full second storey addition and interior alterations to the existing ground floor level.. **** See C of A Decision **** | $350K | Closed |
The 40 most recent of 89 permits on record. Figures come from the City’s active and cleared permit datasets, refreshed daily — what that covers, and what it misses.
Every address on Glenside Ave with a permit on record · 33
- 14 Glenside Ave9 permits · to 2024
- 16 Glenside Ave4 permits · to 2026
- 18 Glenside Ave3 permits · to 2020
- 20 Glenside Ave1 permit · to 2022
- 22 Glenside Ave1 permit · to 2022
- 25 Glenside Ave2 permits · to 2023
- 26 Glenside Ave3 permits · to 2022
- 28 Glenside Ave3 permits · to 2014
- 29 Glenside Ave1 permit · to 2026
- 30 Glenside Ave1 permit · to 2024
- 36 Glenside Ave1 permit · to 2015
- 37 Glenside Ave1 permit · to 1996
- 41 Glenside Ave2 permits · to 1999
- 45 Glenside Ave7 permits · to 2018
- 48 Glenside Ave2 permits · to 2007
- 49 Glenside Ave1 permit · to 2014
- 50 Glenside Ave3 permits · to 2014
- 51 Glenside Ave1 permit · to 2014
- 52 Glenside Ave9 permits · to 2026
- 54 Glenside Ave1 permit · to 2012
- 57 Glenside Ave3 permits · to 2012
- 60 Glenside Ave3 permits · to 2021
- 61 Glenside Ave4 permits · to 2025
- 62 Glenside Ave4 permits · to 2021
- 63 Glenside Ave1 permit · to 2018
- 70 Glenside Ave1 permit · to 2017
- 72 Glenside Ave4 permits · to 2010
- 76 Glenside Ave1 permit · to 2019
- 78 Glenside Ave5 permits · to 2015
- 80 Glenside Ave1 permit · to 2015
- 82 Glenside Ave4 permits · to 2014
- 83 Glenside Ave1 permit · to 2020
- 85 Glenside Ave1 permit · to 2020