Street · 1650 of 8,567 by permit count
Building permits on Gilgorm Rd
The City of Toronto has 118 building permits on record for Gilgorm Rd, going back to 1999. Those permits created 7 homes and removed 8, a net change of -1. Declared construction value totals $5.2M. The most recent permit was issued Apr 7, 2026 at 67 Gilgorm Rd.
- Permits on record
- 1181999–2026
- Declared construction value
- $5.2Mas filed, not adjusted
- Homes created
- 7dwelling units
- Homes removed
- 8net -1
Permits issued per year
20002026 (part year)
Most common work
Structures worked on
Most recent permits
| Issued | Work | What was filed | Value | Status |
|---|---|---|---|---|
| Apr 7, 2026 | Demolition | Proposed demolition of existing dwelling, construct a new dwelling with finished basement. | — | Demolition |
| Apr 7, 2026 | Building Permit Related(PS) | Plumbing - Proposed demolition of existing welling, construct a new dwelling with finished basement. | — | Open |
| Apr 7, 2026 | New Building | Proposed demolition of existing welling, construct a new dwelling with finished basement. | $1.0M | New build |
| Apr 7, 2026 | Building Permit Related (DR) | Drain - Proposed demolition of existing welling, construct a new dwelling with finished basement. | — | Open |
| Sep 18, 2025 | Accessory Building(s) | REV01: Proposed revision to foundation wall to concrete block. Original permit description: Replace existing accessory structure in rear yard of a single family dwelling, with a new accessory structure. Replacement accessory building to be 9.1 sq. m. and 2.49m in height. Demolish existing accessory | — | Open |
| Aug 5, 2025 | Building Permit Related(PS) | Plumbing - Demolish existing accessory structure and construct new accessory structure with washroom in rear yard of single family dwelling. | — | Open |
| Jun 16, 2025 | Accessory Building(s) | Proposed replace existing accessory structure in rear yard of a single family dwelling, with a new accessory structure. Replacement accessory building to be 9.1 sq. m. and 2.49m in height. | $25K | Closed |
| Sep 4, 2024 | Building Permit Related(MS) | HVAC - Proposal to construct a third storey addition, interior alterations and rear third floor balcony. See also 20 167024 and Fnal and Binding A0356/20NY. | — | Closed |
| Jul 31, 2024 | Multiple Projects | Proposal to construct a third storey addition, interior alterations and rear third floor balcony. See also 20 167024 and Fnal and Binding A0356/20NY. | $350K | Closed |
| Jul 31, 2024 | Building Permit Related(PS) | Plumbing - Proposal to construct a third storey addition, interior alterations and rear third floor balcony. See also 20 167024 and Fnal and Binding A0356/20NY. | — | Closed |
| Jun 7, 2024 | Other(SR) | Revision 01: Amended for structural reinforcement to Walkout door header.Proposing a new Deck and Walkout to an existing Single-Family House | — | Open |
| Dec 20, 2023 | Building Permit Related(PS) | Plumbing - Proposal to underpin and finish the basement of an existing SFD-detached dwelling. | — | Open |
| Dec 20, 2023 | Building Permit Related (DR) | Drain - Proposal to underpin and finish the basement of an existing SFD-detached dwelling. | — | Open |
| Dec 11, 2023 | Multiple Projects | Proposal to underpin and finish the basement of an existing SFD-detached dwelling. | $50K | Open |
| Nov 9, 2023 | Other(SR) | UNDERPINNING BASEMENT, NEW BASEMENT LAYOUT AND RELOCATE WASHER AND DRYER TO SECOND FLOOR | $50K | Closed |
| Mar 11, 2022 | Demolition | To demolish existing dwelling used by Crosslink, for completion of proposed landscaping | — | Demolition |
| Nov 9, 2021 | Other(SR) | REV01: REPAIR OF FRONT CANTILEVERED BAY WINDOW | — | Closed |
| Oct 28, 2021 | Interior Alterations | Proposal for Interior Alterations to the existing Single Family Dwelling. | $25K | Closed |
| Oct 28, 2021 | Building Permit Related(PS) | Plumbing - Proposal for Interior Alterations to the existing Single Family Dwelling. | — | Closed |
| Oct 21, 2021 | Building Permit Related(MS) | HVAC - Proposal to construct a new 2 storey SFD-detached dwelling with an integral garage and a finished basement. See also 21 155491 DEM, and 21 124086 MV. | — | Closed |
| Aug 11, 2021 | Building Permit Related(MS) | HVAC - To demolish existing dwelling and constuct a new two storey dwelling | — | Closed |
| Jul 12, 2021 | Building Permit Related (DR) | Drain - To demolish existing dwelling and constuct a new two storey dwelling | — | Closed |
| Jul 12, 2021 | Demolition | To demolish existing dwelling and constuct a new two storey dwelling | — | Demolition |
| Jul 12, 2021 | New Building | To demolish existing dwelling and constuct a new two storey dwelling | $600K | New build |
| Jul 12, 2021 | Building Permit Related(PS) | Plumbing - To demolish existing dwelling and constuct a new two storey dwelling | — | Closed |
| Jun 16, 2021 | Building Permit Related (DR) | Drain - Proposal to construct a new 2 storey SFD-detached dwelling with an integral garage and a finished basement. See also 21 155491 DEM, and 21 124086 MV. | — | Closed |
| Jun 16, 2021 | Demolition | Proposal to demolish the existing 1 storey SFD-detached dwelling. | — | Demolition |
| Jun 16, 2021 | New Building | Proposal to construct a new 2 storey SFD-detached dwelling with an integral garage and a finished basement. See also 21 155491 DEM, and 21 124086 MV. | $500K | New build |
| Jun 16, 2021 | Building Permit Related(PS) | Plumbing - Proposal to construct a new 2 storey SFD-detached dwelling with an integral garage and a finished basement. See also 21 155491 DEM, and 21 124086 MV. | — | Closed |
| May 25, 2021 | Building Permit Related(PS) | Plumbing - Proposed new canopy over front door, minor interior alterations, and add transom window above front door | — | Closed |
| Oct 15, 2020 | Interior Alterations | Proposal for interior alterations to the ground floor for the removal of existing load bearing walls to be replaced with beams and posts. | $10K | Closed |
| Oct 15, 2020 | Building Permit Related(PS) | Plumbing - Proposal for interior alterations to the ground floor for the removal of existing load bearing walls to be replaced with beams and posts. | — | Closed |
| Jul 3, 2020 | Deck | Proposal to replace the existing deck. | $5K | Closed |
| Jun 24, 2020 | Deck | Proposal to construct a new rear deck to existing single family dwelling | $8K | Closed |
| Apr 9, 2020 | Pool Fence Enclosure | Proposed new Pool Fence Enclosure with a new pool in there of dwelling. | $5K | Closed |
| Jan 3, 2020 | Building Permit Related(MS) | HVAC - Proposal to demolish existing sfd and construct new two-storey detached dwelling. | — | Closed |
| Nov 13, 2019 | Building Permit Related (DR) | Drain - Proposal to demolish existing sfd and construct new two-storey detached dwelling. | — | Closed |
| Nov 13, 2019 | Demolition | Proposal to demolish existing sfd and construct new two-storey detached dwelling. | — | Demolition |
| Nov 13, 2019 | New Building | Proposal to demolish existing sfd and construct new two-storey detached dwelling. | $600K | New build |
| Nov 13, 2019 | Building Permit Related(PS) | Plumbing - Proposal to demolish existing sfd and construct new two-storey detached dwelling. | — | Closed |
The 40 most recent of 118 permits on record. Figures come from the City’s active and cleared permit datasets, refreshed daily — what that covers, and what it misses.