Street · 1318 of 8,516 by permit count
Building permits on Fairleigh Cres
The City of Toronto has 145 building permits on record for Fairleigh Cres, going back to 1998. Those permits created 6 homes and removed 3, a net change of +3. Declared construction value totals $8.2M. Half of the 139 permits issued here came through within 13 days of the application. The most recent permit was applied for Sep 30, 2026 at 57 Fairleigh Cres.
- Permits on record
- 1451998–2026
- Declared construction value
- $8.2Mas filed, not adjusted
- Homes created
- 6dwelling units
- Homes removed
- 3net +3
- Typical wait
- 13 days14 days faster than the city
Permits issued per year
Zoning
- Most common zone
- RD97.9% of permits · by-law 10.20
- In detached-house zones
- 97.9%59.9% above the city’s 38.0%
- Permits with a zone
- 145of 145 on record
The zoning categories the permits on Fairleigh Cres fall in, under Zoning By-law 569-2013. These are the City's own category names. This counts permits, not land: it says where the building work happened under which rules, not how the area is carved up. What each zone allows, and what gets built in it.
Most common work
Structures worked on
Postal areas
Other streets in M6C
Looking for one address on Fairleigh Cres? The address lookup shows every permit filed against a single house or building number.
Most recent permits
| Issued | Work | What was filed | Value | Status |
|---|---|---|---|---|
| Sep 30, 2026 | Addition(s) | SECOND FLOOR ADDITION OVER EXISTING BUNGALOW AND ATTACHED GARAGE & REAR DECK | $150K | Open |
| Jul 23, 2026 | Building Permit Related(MS) | HVAC - PROPOSED 2 STOREY FRONT ADDITION (2.88 m2), PROPOSED 2 STOREY REAR ADDITION (63.17 m2), PROPOSED REAR 2ND STOREY ADDITION (55.2 m2), INTERIOR ALTERATIONS THROUGH THE HOUSE (161.20 m2). UNDERPINNING(26.3 M) | — | Open |
| Jun 12, 2026 | Back Water Valve (Sewer only) | Install outside Backwater Valve, no sump pump | — | Closed |
| Mar 24, 2026 | Building Permit Related (DR) | Drain - PROPOSED 2 STOREY FRONT ADDITION (2.88 m2), PROPOSED 2 STOREY REAR ADDITION (63.17 m2), PROPOSED REAR 2ND STOREY ADDITION (7.34 m2), INTERIOR ALTERATIONS THROUGH THE HOUSE (161.20 m2) | — | Closed |
| Mar 24, 2026 | Building Permit Related(PS) | Plumbing - PROPOSED 2 STOREY FRONT ADDITION (2.88 m2), PROPOSED 2 STOREY REAR ADDITION (63.17 m2), PROPOSED REAR 2ND STOREY ADDITION (7.34 m2), INTERIOR ALTERATIONS THROUGH THE HOUSE (161.20 m2) | — | Open |
| Mar 24, 2026 | Multiple Projects | PROPOSED 2 STOREY FRONT ADDITION (2.88 m2), PROPOSED 2 STOREY REAR ADDITION (63.17 m2), PROPOSED REAR 2ND STOREY ADDITION (55.2 m2), INTERIOR ALTERATIONS THROUGH THE HOUSE (161.20 m2). UNDERPINNING(26.3 M) | $1.0M | Open |
| Jun 10, 2025 | Back Water Valve (Sewer only) | Proposal to install a backwater valve for the sanitary drain. | — | Closed |
| May 10, 2023 | New Building | Revision to architectural and structural - interior / exterior revisions and revised grading plans -change to U.F.E.Proposed two storey single family dwelling with unfinished basement, attached garage, front porch and rear deck. | — | New build |
| May 10, 2023 | Building Permit Related(MS) | HVAC - Proposed two storey single family dwelling with unfinished basement, attached garage, front porch and rear deck. | — | Closed |
| Jan 30, 2023 | Demolition | Demolish existing one storey dwelling | — | Demolition |
| Jan 12, 2023 | Back Water Valve (Sewer only) | Installation of Back Water Valve. | — | Closed |
| Dec 12, 2022 | Building Permit Related (DR) | Drain - Proposed two storey dwelling with attached garage finished basement, front porch and rear deck | — | Closed |
| Dec 12, 2022 | Building Permit Related(PS) | Plumbing - Proposed two storey dwelling with attached garage finished basement, front porch and rear deck | — | Closed |
| Apr 15, 2021 | Interior Alterations | Proposal for interior alterations for removing structural interior walls on the main floor between both the kitchen and dining room as well as between the hallway and the living room. Addition of a powder room to the main floor. | $40K | Closed |
| Apr 15, 2021 | Building Permit Related(PS) | Plumbing - Proposal for interior alterations for removing structural interior walls on the main floor between both the kitchen and dining room as well as between the hallway and the living room. Addition of a powder room to the main floor. | — | Closed |
| Feb 1, 2021 | Other(SR) | Proposal to construct a pergola on the deck at the rear of the existing single family dwelling. | $10K | Closed |
| Jan 25, 2021 | Building Permit Related (DR) | Drain - Proposal for a new two-storey rear addition, new third floor addition above existing building, a new rear deck, a new detached rear garage and interior alterations. [ZZC #20 135599 ZZC 00 ZR] | — | Closed |
| Sep 9, 2020 | Multiple Projects | Proposal for a new two-storey rear addition, new third floor addition above existing building, a new rear deck, a new detached rear garage and interior alterations. [ZZC #20 135599 ZZC 00 ZR] | $200K | Closed |
| Sep 9, 2020 | Building Permit Related(PS) | Plumbing - Proposal for 2 storey addition, detached garage and interior alterations | — | Closed |
| Sep 9, 2020 | Building Permit Related(MS) | HVAC - Proposal for 2 storey addition, detached garage and interior alterations | — | Closed |
| Mar 13, 2020 | Building Permit Related(MS) | Revision 01. HVAC - Proposal to demolish existing dwelling and construct a new two storey single family dwelling with a basement. | — | Closed |
| Aug 9, 2019 | Building Permit Related (DR) | Drain - Proposal to demolish existing dwelling and construct a new two storey single family dwelling with a basement. | — | Closed |
| Aug 8, 2019 | Demolition | Proposal to demolish the existing 1 storey SFD-detached dwelling. | — | Demolition |
| Aug 8, 2019 | New Building | Proposal to demolish existing dwelling and construct a new two storey single family dwelling with a basement. | $850K | New build |
| Aug 8, 2019 | Building Permit Related(PS) | Plumbing - Proposal to demolish existing dwelling and construct a new two storey single family dwelling with a basement. | — | Closed |
| Jul 31, 2019 | Pool Fence Enclosure | Proposed pool fence enclosure in rear yard of existing detached dwelling. | $5K | Closed |
| Nov 27, 2018 | Back Water Valve (Sewer only) | Proposal to install back water valve. | — | Closed |
| Nov 15, 2018 | Building Permit Related(PS) | Plumbing - Proposal to construct interior alterations to existing 2 storey dwelling | — | Closed |
| Oct 25, 2018 | Building Permit Related(MS) | HVAC - Proposal to construct interior alterations to existing 2 storey dwelling | — | Closed |
| Oct 24, 2018 | Interior Alterations | Proposal to construct interior alterations to existing 2 storey dwelling | $190K | Closed |
| Jul 23, 2018 | Building Permit Related (DR) | Drain - Proposed basement second suite, interior alterations, rear and side ground floor additions, 2nd storey addition, and rear deck. | — | Closed |
| Jul 23, 2018 | Multiple Projects | Proposed basement second suite, interior alterations, rear and side ground floor additions, 2nd storey addition, and rear deck. | $200K | Closed |
| Jul 23, 2018 | Building Permit Related(PS) | Plumbing - Proposed basement second suite, interior alterations, rear and side ground floor additions, 2nd storey addition, and rear deck. | — | Closed |
| Jun 18, 2018 | Building Permit Related(MS) | HVAC - Proposal to construct a 2-Storey addition to an existing 2-Storey SFD Detached House. Scope of work includes an integral garage. | — | Closed |
| Jun 14, 2018 | Back Water Valve (Sewer only) | install backwater valve | — | Closed |
| Mar 14, 2018 | Multiple Projects | Proposal to construct a 2-Storey addition to an existing 2-Storey SFD Detached House. Scope of work includes an integral garage. | $200K | Closed |
| Mar 14, 2018 | Building Permit Related(PS) | Plumbing - Proposal to construct a 2-Storey addition to an existing 2-Storey SFD Detached House. Scope of work includes an integral garage. | — | Closed |
| Aug 16, 2017 | Other(SR) | Proposal for the installation of a rooftop solar panel. | $15K | Closed |
| Sep 19, 2016 | Building Permit Related(MS) | HVAC - Proposal to construct a new 2-storey dwelling. | — | Closed |
| Jul 21, 2016 | Building Permit Related(PS) | Plumbing - REMOVE INTERIOR LOAD BEARING WALL BETWEEN KITCHEN AND DINING ROOM. INSTALL NEW BEAM AND POSTS TO SUPPORT EXISTING STRUCTURAL. | — | Closed |
The 40 most recent of 145 permits on record. Figures come from the City’s active and cleared permit datasets, refreshed daily — what that covers, and what it misses.
Every address on Fairleigh Cres with a permit on record · 42
- 3 Fairleigh Cres1 permit · to 2015
- 6 Fairleigh Cres3 permits · to 2018
- 8 Fairleigh Cres3 permits · to 2006
- 11 Fairleigh Cres5 permits · to 2016
- 12 Fairleigh Cres5 permits · to 2013
- 14 Fairleigh Cres4 permits · to 2016
- 15 Fairleigh Cres1 permit · to 2007
- 16 Fairleigh Cres3 permits · to 2018
- 17 Fairleigh Cres6 permits · to 2023
- 20 Fairleigh Cres3 permits · to 2014
- 21 Fairleigh Cres6 permits · to 2026
- 22 Fairleigh Cres4 permits · to 2021
- 27 Fairleigh Cres3 permits · to 2012
- 28 Fairleigh Cres2 permits · to 2025
- 29 Fairleigh Cres2 permits · to 2014
- 31 Fairleigh Cres6 permits · to 2020
- 35 Fairleigh Cres2 permits · to 2010
- 36 Fairleigh Cres5 permits · to 2011
- 38 Fairleigh Cres3 permits · to 2011
- 40 Fairleigh Cres5 permits · to 2017
- 41 Fairleigh Cres1 permit · to 2018
- 42 Fairleigh Cres3 permits · to 1999
- 44 Fairleigh Cres7 permits · to 2013
- 45 Fairleigh Cres1 permit · to 2018
- 46 Fairleigh Cres3 permits · to 2009
- 47 Fairleigh Cres3 permits · to 2015
- 48 Fairleigh Cres1 permit · to 2014
- 49 Fairleigh Cres3 permits · to 2003
- 51 Fairleigh Cres4 permits · to 2004
- 52 Fairleigh Cres6 permits · to 2014
- 53 Fairleigh Cres3 permits · to 2010
- 54 Fairleigh Cres5 permits · to 2026
- 57 Fairleigh Cres1 permit · to 2026
- 59 Fairleigh Cres2 permits · to 2014
- 60 Fairleigh Cres5 permits · to 2009
- 68 Fairleigh Cres3 permits · to 2018
- 72 Fairleigh Cres4 permits · to 2009
- 76 Fairleigh Cres1 permit · to 2014
- 80 Fairleigh Cres3 permits · to 2013
- 84 Fairleigh Cres5 permits · to 2023
- 88 Fairleigh Cres5 permits · to 2010
- 90 Fairleigh Cres4 permits · to 2009