thepermitmap

Street · 2164 of 8,516 by permit count

Building permits on Fairfield Ave, Etobicoke

The City of Toronto has 88 building permits on record for Fairfield Ave in Etobicoke, going back to 1997. Those permits created 15 homes and removed 6, a net change of +9. Declared construction value totals $8.1M. Half of the 88 permits issued here came through within 58 days of the application. The most recent permit was issued Sep 17, 2026 at 34 Fairfield Ave.

Permits on record
881997–2026
Declared construction value
$8.1Mas filed, not adjusted
Homes created
15dwelling units
Homes removed
6net +9
Typical wait
58 days31 days slower than the city

Permits issued per year

20022026 (part year)

Zoning

Most common zone
RM100.0% of permits · by-law 10.80
In detached-house zones
0.0%38.0% below the city’s 38.0%
Permits with a zone
88of 88 on record
  • Residential88 · 100%

The zoning categories the permits on Fairfield Ave fall in, under Zoning By-law 569-2013. These are the City's own category names. This counts permits, not land: it says where the building work happened under which rules, not how the area is carved up. What each zone allows, and what gets built in it.

Minor variances at the Committee of Adjustment

Applications on record
28since 2016
Approved
85.0%5.8% below the city · 20 decided
Median time to a decision
116 days4 days faster than the city

Some projects on Fairfield Ave need the Committee of Adjustment to approve a minor variance from the zoning by-law before a building permit can be applied for at all. Where that applies, the committee’s clock runs first and the permit wait above starts only once it has stopped. Back to back, that is about 174 days, not the 58 days the permit figure alone suggests. How variances work, and the approval rates.

Other streets in M8W

Savona Dr92 permits
Long Branch Ave91 permits
Laburnham Ave89 permits
North Carson St86 permits
Sheldon Ave86 permits
Lanor Ave83 permits
Gair Dr80 permits

Looking for one address on Fairfield Ave? The address lookup shows every permit filed against a single house or building number.

Most recent permits

Issued Work What was filed Value Status
Sep 17, 2026 Demolition proposed 2 storey single family dwelling — Demolition
Sep 16, 2026 Building Permit Related(MS) HVAC - Proposed 2 storey single family dwelling — Open
Sep 16, 2026 Building Permit Related(PS) Plumbing - Proposed 2 storey single family dwelling — Open
Sep 16, 2026 Building Permit Related (DR) Drain - Proposed 2 storey single family dwelling — Open
Sep 16, 2026 New Building Proposed 2 storey single family dwelling $870K New build
Sep 9, 2026 Building Permit Related(PS) Plumbing - Proposed 2 storey single family dwelling with an attached garage, front and rear porch — Open
Sep 9, 2026 Building Permit Related (DR) Drain - Proposed 2 storey single family dwelling with an attached garage, front and rear porch — Open
Sep 9, 2026 Building Permit Related(MS) HVAC - Proposed 2 storey single family dwelling with an attached garage, front and rear porch — Open
Sep 9, 2026 New Building Proposed 2 storey single family dwelling with an attached garage, front and rear porch - Conveyed Land $870K New build
Aug 14, 2026 Back Water Valve (Sewer only) Proposal to install backwater valve & sump pump. — Closed
Jun 2, 2026 Building Permit Related(PS) Plumbing - CONSTRUCTION OF A NEW THREE STOREY MULTIPLEX — Open
Jun 2, 2026 Building Permit Related (DR) Drain - CONSTRUCTION OF A NEW THREE STOREY MULTIPLEX — Open
May 19, 2026 Demolition DEMOLITION OF A ONE STOREY DETAHCED HOUSE — Demolition
May 15, 2026 Building Permit Related (DR) Drain - CONSTRCUTION OF A NEW GARDEN SUITE — Open
May 15, 2026 Building Permit Related(MS) HVAC - CONSTRCUTION OF A NEW GARDEN SUITE — Open
May 15, 2026 Building Permit Related(MS) HVAC - CONSTRUCTION OF A NEW THREE STOREY MULTIPLEX — Open
May 15, 2026 New Laneway / Rear Yard Suite CONSTRCUTION OF A NEW GARDEN SUITE $1.0M Open
May 15, 2026 Building Permit Related(PS) Plumbing - CONSTRCUTION OF A NEW GARDEN SUITE — Open
May 15, 2026 New Building CONSTRUCTION OF A NEW THREE STOREY MULTIPLEX $1.0M New build
Mar 21, 2024 Addition(s) Proposal to construct a 2 storey rear addition to an exisiting detached SFD $300K Open
Mar 21, 2024 Building Permit Related (DR) Drain - Proposal to construct a 2 storey rear addition to an exisiting detached SFD — Open
Mar 21, 2024 Building Permit Related(PS) Plumbing - Proposal to construct a 2 storey rear addition to an exisiting detached SFD — Open
Jan 4, 2024 Demolition Demo existing 1 storey house — Demolition
Jan 4, 2024 Building Permit Related (DR) Drain - New 2 storey SFD detached with basment walkout, front porch and rear deck — Open
Jan 4, 2024 Building Permit Related(PS) Plumbing - New 2 storey SFD detached with basment walkout, front porch and rear deck — Open
Jan 4, 2024 New Building New 2 storey SFD detached with basment walkout, front porch and rear deck $700K New build
Mar 28, 2023 Other(SR) Revision 01: Proposal to revise basement layoutTo maintain and legalize existing six dwelling units. — Closed
Aug 9, 2022 Interior Alterations Proposal to construct interior alterations to the basement of an existing 3-unit detached dwelling. $30K Closed
Jan 10, 2022 Building Permit Related(MS) HVAC - Two storey dwelling with integral garage — Closed
Jul 15, 2021 Deck Rebuild second storey deck to ground. $20K Closed
Jul 9, 2021 Demolition Demolish the existing one storey dwelling — Demolition
Jul 9, 2021 Building Permit Related (DR) Drain - Two storey dwelling with integral garage — Closed
Jul 9, 2021 New Building Two storey dwelling with integral garage $400K New build
Jul 9, 2021 Building Permit Related(PS) Plumbing - Two storey dwelling with integral garage — Closed
Apr 21, 2021 Building Permit Related(PS) Plumbing - Proposal to construct a one storey addition, deck, and detached garage. — Open
Apr 21, 2021 Multiple Projects Proposal to construct a one storey rear addition, deck, and detached garage. $50K Open
Apr 21, 2021 Building Permit Related(MS) HVAC - Proposal to construct a one storey addition, deck, and detached garage. — Open
Nov 9, 2020 Building Permit Related(MS) HVAC - Proposal for a 1 storey side addition and a deck at the rear of an existing 1 storey SFD-detached dwelling. — Closed
Oct 6, 2020 Building Permit Related(PS) Plumbing - Proposal for a 1 storey side addition and a deck at the rear of an existing 1 storey SFD-detached dwelling. — Closed
Aug 10, 2020 Multiple Projects Proposal for a 1 storey side addition and a deck at the rear of an existing 1 storey SFD-detached dwelling. $75K Closed

The 40 most recent of 88 permits on record. Figures come from the City’s active and cleared permit datasets, refreshed daily — what that covers, and what it misses.

Every address on Fairfield Ave with a permit on record · 22

  • 6 Fairfield Ave9 permits · to 2019
  • 10 Fairfield Ave2 permits · to 2019
  • 16 Fairfield Ave1 permit · to 2022
  • 22 Fairfield Ave5 permits · to 2021
  • 25 Fairfield Ave1 permit · to 2005
  • 28 Fairfield Ave2 permits · to 2004
  • 30 Fairfield Ave4 permits · to 2018
  • 31 Fairfield Ave6 permits · to 2017
  • 33 Fairfield Ave3 permits · to 2024
  • 34 Fairfield Ave9 permits · to 2026
  • 39 Fairfield Ave5 permits · to 2023
  • 42 Fairfield Ave5 permits · to 2022
  • 45 Fairfield Ave7 permits · to 2013
  • 51 Fairfield Ave5 permits · to 2017
  • 55 Fairfield Ave1 permit · to 2002
  • 57 Fairfield Ave3 permits · to 1997
  • 59 Fairfield Ave9 permits · to 2026
  • 64 Fairfield Ave2 permits · to 2015
  • 68 Fairfield Ave1 permit · to 2002
  • 75 Fairfield Ave1 permit · to 2026
  • 78 Fairfield Ave4 permits · to 2024
  • 79 Fairfield Ave3 permits · to 2020
Source
City of Toronto Open Data
Dataset
Building permits, active + cleared
Records
88
Data through
2026-09-17
Refresh
Daily from the City
Sheet
STR-945