Street · 3947 of 8,567 by permit count
Building permits on Eastside Dr
The City of Toronto has 38 building permits on record for Eastside Dr, going back to 2016. Declared construction value totals $7.2M. The most recent permit was issued Nov 28, 2025 at 123 Eastside Dr.
- Permits on record
- 382016–2025
- Declared construction value
- $7.2Mas filed, not adjusted
- Homes created
- 0dwelling units
- Homes removed
- 0net +0
Permits issued per year
20162025 (part year)
Most common work
Structures worked on
Most recent permits
| Issued | Work | What was filed | Value | Status |
|---|---|---|---|---|
| Nov 28, 2025 | Building Permit Related(PS) | Plumbing - Proposal for interior alterations to renovate a portion of an open warehouse into a plant for product formulation and to test manufacturing methods. | — | Open |
| Nov 28, 2025 | Building Permit Related(MS) | HVAC - Proposal for interior alterations to renovate a portion of an open warehouse into a plant for product formulation and to test manufacturing methods. | — | Open |
| Nov 28, 2025 | Interior Alterations | Proposal for interior alterations to renovate a portion of an open warehouse into a plant for product formulation and to test manufacturing methods. | $4.0M | Open |
| Jun 11, 2025 | Other Temporary Tents | Installation of a 40'x200' Frame Tent for a Corporate BBQ StaffAppreciation Event. Install on June 6th and Remove on June 8th 2025 | — | Open |
| Jul 15, 2024 | Building Permit Related(MS) | Revision 01 - Addition of gas heater.HVAC - Interior alterations to a vacant warehouse - Unit 2 | — | Closed |
| May 13, 2024 | Building Permit Related(MS) | HVAC - Proposal to construct interior alterations to model suite office/warehouse | — | Open |
| May 13, 2024 | Building Permit Related(PS) | Plumbing - Proposal to construct interior alterations to model suite office/warehouse | — | Open |
| May 8, 2024 | Interior Alterations | Proposal to construct interior alterations to model suite office/warehouse | $200K | Open |
| Jan 8, 2024 | Addition(s) | REVISION 01: Proposal for mezzanine addition (Skin care manufacturing)Minor revisions to the new mezzanine which was approved in the main building permit. | — | Open |
| Oct 16, 2023 | Building Permit Related(MS) | HVAC - Proposal for mezzanine addition | — | Open |
| Oct 12, 2023 | Building Permit Related(MS) | HVAC - New concrete pad for an additional compressor. Change at Egress path and exit for compressor room and mainenance room. Alterations also include change at swing way double door, replace double door to single door - Skin Care Facility | — | Open |
| Oct 12, 2023 | Interior Alterations | New concrete pad for an additional compressor. Change at Egress path and exit for compressor room and mainenance room. Alterations also include change at swing way double door, replace double door to single door - Skin Care Facility | $50K | Open |
| Sep 22, 2023 | Building Permit Related(FS) | FS - Sprinkler Shop Drawing - Proposal for mezzanine addition | — | Open |
| Sep 15, 2023 | Building Permit Related(PS) | Plumbing - Interior alterations to a vacant warehouse - Unit 2 | — | Closed |
| Sep 12, 2023 | Interior Alterations | Interior alterations to a vacant warehouse - Unit 2 | $300K | Open |
| Mar 10, 2023 | Fire Alarm | REV 01: Fire Alarm System Installation - Revision - Addition of Horn in Pre-weight room (Arch Changes) and addition of strobe in barrier free washroom (Building department review).Fire alarm system installation on the ground floor | — | Closed |
| Feb 3, 2023 | Interior Alterations | Rev 02 - Revision to the layout in rooms 4-111 pre-weigh, 4-101 Pre-Weigh Storage, 4-107 Sanitation Compounding office, 4-116 Processing Chiller Room, revise door size at 4-120 Waste Water Treatment, delete 4-118J Phone Booth, delete one folding partition in 4-108 Training, and other changes as per | — | Closed |
| Jan 11, 2023 | Building Permit Related(MS) | Rev 02 - Unit heater UH-1 installed in process chiller room to help maintain an adequate room temperature. Unit heater complete with flue vent and combustion air pipes that penetrates through the roof, exhaust from existing RO room to be diverted from within building to outside with a roof penetrati | — | Closed |
| Dec 14, 2022 | Interior Alterations | REV. 01: Erection of racking and in rack fire suppression alterations to suit 7Proposed new Interior Alterations to the existing rack storage and sprinklersNew rack and strorage system. Previous permit 20-166439 (VN) | $60K | Open |
| Nov 22, 2022 | Building Permit Related(PS) | Rev 03 - Extend demolition of below grade sanitary main that runs in corridor, cut back existing sump pit discharge to accommodate new waste water system discharge, extended 100mm drain from AOP tank overflow to sump pit 1, extended 50mm drain from sludge tank overflow to sump pit 3, new floor sink | — | Closed |
| Jun 8, 2022 | Building Permit Related(PS) | Plumbing Revision 1 ( Feb 3 2022):Revise tie-in location of sump pump discharge from City sewer to existing 4" sanitary main within the 123 Eastside drive buildingPlumbing Revision 2 ( June 7 2022):Upgrade of existing electrical service, including the replacement of the outdoor transformer with a To | — | Closed |
| Apr 11, 2022 | Other(MS) | Installation of a Diversitech FH-27 Dust Collector complete with carbon dioxide fire suppression system, explosion suppression system and spark detection system | $470K | Closed |
| Nov 16, 2021 | Building Permit Related(MS) | HVAC - Proposal for upgrade of existing main utility electrical service. Construction of new Toronto Hydro electrical vault (to THES standard), construction of new electrical room, and construction of access (non-egress) to electrical room via rooftop. Upgrade of existing egress path to meet Code eg | — | Closed |
| Nov 16, 2021 | Multiple Projects | Proposal for upgrade of existing main utility electrical service. Construction of new Toronto Hydro electrical vault (to THES standard), construction of new electrical room, and construction of access (non-egress) to electrical room via rooftop. Upgrade of existing egress path to meet Code egress eq | $2.0M | Closed |
| Jun 3, 2021 | Interior Alterations | Revision 01 - sprinklersProposal for interior alteration for existing Skin Care Manufacturing and Storage Facility.Scope of work invpolves only interior non load bearing wall aprtitions removal and new interior partitions. They will come in future with the additional scope of work. | — | Closed |
| Jul 29, 2020 | Fixtures/Roof Drains: Other | Proposed interior alterations to increase size of cafeteria and locker room, new washrooms in unit 5 and a new washrooms in unit 6 of an existing Skin Care Manufacturing and Storage Facility. | — | Closed |
| Jun 3, 2020 | Building Permit Related(PS) | Plumbing - Proposal for interior alteration for existing Skin Care Manufacturing and Storage Facility.Scope of work invpolves only interior non load bearing wall aprtitions removal and new interior partitions. They will come in future with the additional scope of work. | — | Closed |
| May 12, 2020 | Building Permit Related(MS) | HVAC - Proposal for interior alteration for existing Skin Care Manufacturing and Storage Facility | — | Closed |
| Jan 17, 2020 | Fire Alarm | Installation of fire alarm system. | $15K | Closed |
| Nov 26, 2018 | Building Permit Related(MS) | REV #1-REVISE LAYOUTHVAC - Proposed interior alterations to convert an existing warehouse, unit 4, into a production area for batching, filling, & packaging of cosmetic products. This area is connected to unit(s) 5/6 regarding the permit #: 17-250540 BLD 00 BA. | — | Closed |
| Nov 26, 2018 | Interior Alterations | REV #1-REVISE WALLSProposed interior alterations to convert an existing warehouse, unit 4, into a production area for batching, filling, & packaging of cosmetic products and reniforcment of roof. This area is connected to unit(s) 5/6 regarding the permit #: 17-250540 BLD 00 BA. | — | Closed |
| Oct 23, 2018 | Building Permit Related(MS) | REV01: as per bubbled drawingsHVAC - Proposed addition of two new demising metal stud partitions, installation of new storage racks and installation of new sprinklers throughout the existing warehouse. | — | Closed |
| Apr 25, 2018 | Building Permit Related(PS) | Plumbing - Proposed interior alterations to convert an existing warehouse, unit 4, into a production area for batching, filling, & packaging of cosmetic products. This area is connected to unit(s) 5/6 regarding the permit #: 17-250540 BLD 00 BA. | — | Closed |
| Apr 24, 2018 | Multiple Projects | Revision #01 - Interior alterations change to provide new washrooms in unit(s) 5/6 to accomidate for unit 4 (not shown in plan) and reinforce the roofProposed addition of two new demising metal stud partitions, installation of new storage racks and installation of new sprinklers throughout the exist | — | Closed |
| Apr 20, 2018 | Building Permit Related(PS) | Plumbing - Proposed addition of two new demising metal stud partitions, installation of new storage racks and installation of new sprinklers throughout the existing warehouse. | — | Closed |
| Apr 16, 2018 | Interior Alterations | Proposal to create a wall opening for additional loading door way, and ramp | $70K | Closed |
| Mar 23, 2017 | Backflow Prevention Devices (Water only) | Install DCVA after domestic water meter. | $2K | Closed |
| Sep 9, 2016 | Backflow Prevention Devices (Water only) | Proposal to install a 1 inch backflow prevention device. | $1K | Open |
The 38 most recent of 38 permits on record. Figures come from the City’s active and cleared permit datasets, refreshed daily — what that covers, and what it misses.