Street · 392 of 8,565 by permit count
Building permits on Coleridge Ave
The City of Toronto has 397 building permits on record for Coleridge Ave, going back to 1998. Those permits created 16 homes and removed 7, a net change of +9. Declared construction value totals $13.2M. The most recent permit was applied for Sep 9, 2026 at 5 Coleridge Ave.
- Permits on record
- 3971998–2026
- Declared construction value
- $13.2Mas filed, not adjusted
- Homes created
- 16dwelling units
- Homes removed
- 7net +9
Permits issued per year
20002026 (part year)
Most common work
Structures worked on
Most recent permits
| Issued | Work | What was filed | Value | Status |
|---|---|---|---|---|
| Sep 9, 2026 | Building Permit Related(PS) | Plumbing - Proposal to convert the existing single-family dwelling to a five-unit multiplex, with the construction of second and third storey additions, a rear addition, underpinning, and a rear basement walkout | — | Open |
| Sep 9, 2026 | Building Permit Related(MS) | HVAC - Proposal to convert the existing single-family dwelling to a five-unit multiplex, with the construction of second and third storey additions, a rear addition, underpinning, and a rear basement walkout | — | Open |
| Sep 9, 2026 | Building Permit Related (DR) | Drain - Proposal to convert the existing single-family dwelling to a five-unit multiplex, with the construction of second and third storey additions, a rear addition, underpinning, and a rear basement walkout | — | Open |
| Sep 4, 2026 | Multiple Projects | Proposal to convert the existing single-family dwelling to a five-unit multiplex, with the construction of second and third storey additions, a rear addition, underpinning, and a rear basement walkout | $1.4M | Open |
| Aug 28, 2026 | Piping: SFD/Semi | REVISION-01: Add backwater valveResidential plumbing repair: Replacing vertical main stack and upgrading 5 feet of underground drain to PVC with a new 4-inch base cleanout. Main stack size is 3'-inch and 15 feet in length. Connect to the bathroom on the 2nd floor and route and pickup the kitchen dra | — | Open |
| Aug 27, 2026 | Addition(s) | Proposal for a 1-storey rear addition. | $80K | Open |
| Aug 26, 2026 | Multiple Projects | Rev 01 - Proposed underpinning and finished basementProposed addition to second storey and interior alterations, new deck and canopy | — | Open |
| Aug 26, 2026 | Party Wall Admin Permits | Admin permit related to 83 Coleridge Ave (26 130791 BLD 00 SR) | $1K | Open |
| Aug 19, 2026 | Inside and Outside Drains | Residential plumbing repair: Replacing vertical main stack and upgrading 5 feet of underground drain to PVC with a new 4-inch base cleanout. Main stack size is 3'-inch and 15 feet in length. Connect to the bathroom on the 2nd floor and route and pickup the kitchen drain. Run the stack down to the ba | $1K | Open |
| Aug 6, 2026 | Building Permit Related(MS) | HVAC - Proposed addition to second storey and interior alterations, new deck and canopy | — | Open |
| Jul 21, 2026 | Building Permit Related(MS) | HVAC - Proposal for a 1-storey rear addition. | — | Open |
| Jul 15, 2026 | Building Permit Related(PS) | Plumbing - Proposal to construct rear second floor extension | — | Open |
| Jul 15, 2026 | Building Permit Related(MS) | HVAC - Proposal to construct rear second floor extension | — | Open |
| Jul 15, 2026 | Multiple Projects | Proposal to construct rear second floor extension | $20K | Open |
| Jun 25, 2026 | Building Permit Related(MS) | HVAC - Proposal for rear addition, interior alterations and basement underpinning | — | Open |
| Jun 15, 2026 | Back Water Valve (Sewer only) | Install backwater valve for main sanitary line inside front wall | — | Closed |
| May 21, 2026 | Building Permit Related(PS) | Plumbing - Proposal for rear addition, interior alterations and basement underpinning | — | Open |
| May 21, 2026 | Building Permit Related (DR) | Drain - Proposal for rear addition, interior alterations and basement underpinning | — | Open |
| Apr 27, 2026 | Multiple Projects | Proposal for rear addition, interior alterations and basement underpinning | $200K | Open |
| Apr 13, 2026 | Other(PS) | REMODEL SECOND FLOOR BATHROOM | $25K | Closed |
| Feb 27, 2026 | Interior Alterations | interior alterations to basement to include multiple bedrooms, washroom and kitchen. | $300K | Open |
| Feb 27, 2026 | Building Permit Related(PS) | Plumbing - interior alterations to basement to include multiple bedrooms, washroom and kitchen. | — | Open |
| Feb 11, 2026 | Building Permit Related(PS) | Plumbing - Proposal for interior alterations to add bathroom in basement | — | Open |
| Feb 11, 2026 | Building Permit Related (DR) | Drain - Proposal for interior alterations to add bathroom in basement | — | Open |
| Feb 11, 2026 | Interior Alterations | Proposal for interior alterations to add bathroom in basement | $5K | Open |
| Feb 6, 2026 | Building Permit Related(MS) | HVAC - PROPOSED SECOND FLOOR ADDITION OVER EXISTING, SIDE ADDITION & INTERIOR ALTER-PLUMBING PERMIT | — | Open |
| Jan 20, 2026 | Other(SR) | REV 01: Revision to match mechanical plans.PROPOSED SECOND FLOOR ADDITION OVER EXISTING, SIDE ADDITION & INTERIOR ALTER-PLUMBING PERMIT | — | Open |
| Jan 15, 2026 | Building Permit Related(MS) | HVAC - Proposal to construct rear side addition, new second floor addition, new Porch, existing Garage to be maintained and interior alterations to the existing single family dwellings. | — | Open |
| Dec 22, 2025 | Back Water Valve (Sewer only) | Proposal to install a backwater valve on the sanitary line in an existing SFD-detached dwelling. | — | Closed |
| Dec 11, 2025 | Building Permit Related(MS) | REV01: Proposed revision to garden suiteHVAC - Proposal to construct a new two- storey garden suite in rear yard of an existing SFD-detached dwelling.See also 24 137792 ZAP. | — | Open |
| Sep 17, 2025 | Building Permit Related(MS) | HVAC - Proposal for a 3-storey SFD-Detached. | — | Open |
| Sep 16, 2025 | Building Permit Related(PS) | Plumbing - Proposal for a 3-storey SFD-Detached. | — | Open |
| Sep 16, 2025 | Building Permit Related (DR) | Drain - Proposal for a 3-storey SFD-Detached. | — | Open |
| Sep 16, 2025 | Demolition | Proposal for a 3-storey SFD-Detached. | — | Demolition |
| Sep 16, 2025 | New Building | Proposal for a 3-storey SFD-Detached. | $400K | New build |
| Aug 28, 2025 | Deck | Propsoal to re-build front porch stairs | $5K | Closed |
| Jul 28, 2025 | New Laneway / Rear Yard Suite | Revision 01: Changes to layout Proposal to construct a new two- storey garden suite in rear yard of an existing SFD-detached dwelling.See also 24 137792 ZAP. | — | Open |
| Jul 25, 2025 | Building Permit Related(MS) | HVAC - Basement underpinning, excavating crawl space beneath front porch. | — | Open |
| Jun 8, 2025 | Multiple Projects | REVISION - revised interior alterations and front porch enclosureBasement underpinning, excavating crawl space beneath front porch. | — | Open |
| May 5, 2025 | Back Water Valve (Sewer only) | installation of backwater valve | — | Closed |
The 40 most recent of 397 permits on record. Figures come from the City’s active and cleared permit datasets, refreshed daily — what that covers, and what it misses.