Street · 6203 of 8,516 by permit count
Building permits on Clay Crt, Etobicoke
The City of Toronto has 14 building permits on record for Clay Crt in Etobicoke, going back to 1997. Those permits created 1 homes and removed 2, a net change of -1. Declared construction value totals $610K. The most recent permit was issued Feb 4, 2022 at 19 Clay Crt.
- Permits on record
- 141997–2022
- Declared construction value
- $610Kas filed, not adjusted
- Homes created
- 1dwelling units
- Homes removed
- 2net -1
Permits issued per year
Most common work
Structures worked on
Postal areas
Other streets in M9A
Looking for one address on Clay Crt? The address lookup shows every permit filed against a single house or building number.
Most recent permits
| Issued | Work | What was filed | Value | Status |
|---|---|---|---|---|
| Feb 4, 2022 | Building Permit Related(MS) | Revision to HVAC - Ductwork layout changes for all levels and secondary in floor heating with combi-unit. | — | Closed |
| May 3, 2021 | Interior Alterations | Proposal to remove an existing interior wall to create an open concept with a beam from outside wall to outside wall | $10K | Open |
| Mar 17, 2021 | Demolition | Demolish existing dwelling and proposed new single family dwelling | — | Demolition |
| Mar 17, 2021 | Building Permit Related (DR) | Drain - Demolish existing dwelling and proposed new single family dwelling | — | Open |
| Mar 17, 2021 | Building Permit Related(PS) | Plumbing - Demolish existing dwelling and proposed new single family dwelling | — | Open |
| Mar 17, 2021 | New Building | Demolish existing dwelling and proposed new single family dwelling | $500K | New build |
| May 20, 2015 | Building Permit Related(MS) | Revision 03 re; HVAC SystemHVAC - Construct new 2 storey dwellingrevision to HVAC layout | — | Closed |
| Oct 9, 2009 | New Building | Revision 2: Front porch basement alteration, to replace front porch columns and second floor layout change at rear. (Construct new 2 storey dwellingrevision for steel beam at rear and raise elevation above grade and reduce roof slope) | — | New build |
| Apr 2, 2009 | Demolition | Demolish exisiting split level dwelling | — | Demolition |
| Apr 2, 2009 | Building Permit Related(PS) | Plumbing - Construct new 2 storey dwelling | — | Closed |
| Apr 21, 2004 | Building Permit Related(PS) | Plumbing - Proposed rear 1 storey add'n to exist. SFD - Addition(s) | — | Closed |
| Apr 21, 2004 | Addition(s) | Proposed rear 1 storey add'n to exist. SFD | $100K | Closed |
| Aug 1, 1997 | Addition to Existing Building | ADDITION TO SINGLE FAMILY DWELLING | — | Closed |
| Jun 25, 1997 | Unknown | DEMOLITION OF ATTACHED GARAGE | — | Closed |
The 14 most recent of 14 permits on record. Figures come from the City’s active and cleared permit datasets, refreshed daily — what that covers, and what it misses.
Every address on Clay Crt with a permit on record · 4
- 3 Clay Crt3 permits · to 2021
- 7 Clay Crt2 permits · to 1997
- 18 Clay Crt4 permits · to 2015
- 19 Clay Crt5 permits · to 2022