Street · 5280 of 8,567 by permit count
Building permits on Carr St
The City of Toronto has 21 building permits on record for Carr St, going back to 2003. Those permits created 0 homes and removed 1, a net change of -1. Declared construction value totals $937K. The most recent permit was applied for Aug 12, 2026 at 42 Carr St.
- Permits on record
- 212003–2026
- Declared construction value
- $937Kas filed, not adjusted
- Homes created
- 0dwelling units
- Homes removed
- 1net -1
Permits issued per year
20032026 (part year)
Most common work
Structures worked on
Most recent permits
| Issued | Work | What was filed | Value | Status |
|---|---|---|---|---|
| Aug 12, 2026 | New Building | REV 01: Revising west side yard setback from 0.90m to 0.45m and associated floor plan changes because of the side yard setback revision.Demolition of existing one storey house, shed, and garage. Construction of new three storey sixplex. | — | New build |
| Aug 11, 2026 | Demolition | Demolition of existing one storey house, shed, and garage. Construction of new three storey sixplex. | — | Demolition |
| Jul 9, 2026 | Balcony/Guard Repairs | Proposed balcony replacement. | $274K | Open |
| Nov 20, 2025 | Party Wall Admin Permits | work at 32 Carr - admin permits | — | Open |
| Nov 20, 2025 | Building Permit Related (DR) | Drain - proposal for underpinning and basement finishing | — | Open |
| Nov 20, 2025 | Multiple Projects | proposal for underpinning and basement finishing | $20K | Open |
| Nov 20, 2025 | Building Permit Related(PS) | Plumbing - proposal for underpinning and basement finishing | — | Open |
| Dec 27, 2023 | Building Permit Related(PS) | Plumbing - 1. CONVERT CLOSET TO STANDING SHOWER AS SHOWN2. REMOVE & REBUILD KITCHEN ISLAND WITH KITCHEN SINK AS SHOWN | — | Closed |
| Dec 22, 2023 | Interior Alterations | 1. CONVERT CLOSET TO STANDING SHOWER AS SHOWN2. REMOVE & REBUILD KITCHEN ISLAND WITH KITCHEN SINK AS SHOWN | $10K | Closed |
| Jun 14, 2022 | Garage | Rebuild existing garage | $25K | Open |
| Dec 3, 2021 | Multiple Projects | Proposed addition (new concrete deck with cover at rear ) alterations replacement of the existing window to new door on rear elvevation to existing semi | $12K | Closed |
| Oct 3, 2016 | Multiple Projects | Concrete repairs at podium deck & terrances, waterproofing, and eave repairs for a townhouse block building within the existing stacked townhouse complex having parking below. CONVENIENCE ADDRESS - 60 CARR STREET | $220K | Open |
| Sep 30, 2016 | Multiple Projects | Concrete repairs at podium deck & terrances, waterproofing, and eave repairs for a townhouse block building within the existing stacked townhouse complex having parking below. CONVENIENCE ADDRESS - 98 CARR STREET | $220K | Closed |
| Mar 10, 2015 | Building Permit Related(MS) | HVAC - Proposal for interior alteration of existing semi-detached dwelling. | — | Open |
| Mar 4, 2015 | Building Permit Related (DR) | Install 1 sump pump and 1 backwater valveDrain - Proposal for interior alteration of existing semi-detached dwelling. | — | Closed |
| Mar 2, 2015 | Building Permit Related(PS) | Plumbing - Proposal for interior alteration of existing semi-detached dwelling. | — | Open |
| Mar 2, 2015 | Interior Alterations | Proposal for interior alteration of existing semi-detached dwelling. | $150K | Open |
| May 3, 2010 | Backflow Prevention Devices (Water only) | Proposal to install one back flow prevention device to apartment building | $3K | Closed |
| Jan 5, 2010 | Building Permit Related(PS) | Plumbing - Removal of ground floor non and load bearing walls and installation of new beam. | — | Closed |
| Nov 12, 2009 | Interior Alterations | Removal of ground floor non and load bearing walls and installation of new beam. | $3K | Closed |
| Jun 10, 2003 | Carport | Reconstruct detached carport at side, fence and stair landing damaged by car fire. Insurance report and inspectors letter attached. | $1K | Closed |
The 21 most recent of 21 permits on record. Figures come from the City’s active and cleared permit datasets, refreshed daily — what that covers, and what it misses.