Street · 2161 of 8,516 by permit count
Building permits on Butterworth Ave, Scarborough
The City of Toronto has 88 building permits on record for Butterworth Ave in Scarborough, going back to 2000. Those permits created 6 homes and removed 7, a net change of -1. Declared construction value totals $1.8M. Half of the 87 permits issued here came through within 45 days of the application. The most recent permit was issued Sep 11, 2026 at 15 Butterworth Ave.
- Permits on record
- 882000–2026
- Declared construction value
- $1.8Mas filed, not adjusted
- Homes created
- 6dwelling units
- Homes removed
- 7net -1
- Typical wait
- 45 days18 days slower than the city
Permits issued per year
Zoning
- Most common zone
- RS98.9% of permits · by-law 10.40
- In detached-house zones
- 0.0%38.0% below the city’s 38.0%
- Permits with a zone
- 88of 88 on record
The zoning categories the permits on Butterworth Ave fall in, under Zoning By-law 569-2013. These are the City's own category names. This counts permits, not land: it says where the building work happened under which rules, not how the area is carved up. What each zone allows, and what gets built in it.
Minor variances at the Committee of Adjustment
- Applications on record
- 23since 2016
- Approved
- 100.0%9.2% above the city · 20 decided
- Median time to a decision
- 148 days28 days slower than the city
Some projects on Butterworth Ave need the Committee of Adjustment to approve a minor variance from the zoning by-law before a building permit can be applied for at all. Where that applies, the committee’s clock runs first and the permit wait above starts only once it has stopped. Back to back, that is about 193 days, not the 45 days the permit figure alone suggests. How variances work, and the approval rates.
Most common work
Structures worked on
Postal areas
Other streets in M1L
Looking for one address on Butterworth Ave? The address lookup shows every permit filed against a single house or building number.
Most recent permits
| Issued | Work | What was filed | Value | Status |
|---|---|---|---|---|
| Sep 11, 2026 | New Building - By Renovation | Revision 02 - minor interor layout and some structural changesRevision 01: Proposed Basement revised to two levels, Ground floor area reduced, Unit 2 area reduced, additional basement space allocated to main unit, Minor interior changes: wider sliding doors and windows.proposal to demolish over 50% | — | New build |
| Aug 21, 2026 | Building Permit Related(MS) | HVAC - proposal to demolish over 50% of the main walls of a one-storey house and constructing a three-storey residential dwelling with a single-car garage. It will contain two units: one on the basement and first floor, and one on the second and third floors. | — | Open |
| Jun 2, 2026 | Back Water Valve (Sewer only) | Dig, and install a back water valve on the existing underground building sanitary drain/sewer service outside. | — | Closed |
| May 27, 2026 | Building Permit Related(PS) | Plumbing - proposal to demolish more than 50% of the main walls of a one-storey house and constructing a three-storey residential dwelling with a single-car garage. It will contain two units: one on the basement and first floor, and one on the second and third floors. | — | Open |
| May 27, 2026 | Building Permit Related (DR) | Drain - proposal to demolish more than 50% of the main walls of a one-storey house and constructing a three-storey residential dwelling with a single-car garage. It will contain two units: one on the basement and first floor, and one on the second and third floors. | — | Open |
| Aug 27, 2025 | Demolition | Proposal to demolish the existing 1-storey dwelling and construct a new 3-storey 2 unit dwelling with a single car garage. | — | Demolition |
| Mar 7, 2025 | New Building | Revison #1 - as per order to comply Proposal to demolish existing 1 storey single family dwelling to construct 2 new 2 storey single family dwellings - Part 2 | — | New build |
| Mar 7, 2025 | New Building | Revision 02 - as attached order to complyRev 01: interior changesProposal to demolish existing 1 storey single family dwelling to construct 2 new 2 storey single family dwellings - Part 1 | — | New build |
| Jan 8, 2025 | Building Permit Related(MS) | Rev 01 - Interior changes.HVAC - Proposal to demolish existing 1 storey single family dwelling to construct 2 new 2 storey single family dwellings - Part 1 | — | Closed |
| Sep 28, 2023 | New Building | REV 02: Convert bedroom to gym and wetbar to kitchen for owner useREV 01: proposing revision to PERMIT #22-100698 | — | New build |
| Jun 27, 2023 | Demolition | Proposal to demolish existing 1 storey single family dwelling to construct 2 new 2 storey single family dwellings | — | Demolition |
| Jun 27, 2023 | Building Permit Related (DR) | Drain - Proposal to demolish existing 1 storey single family dwelling to construct 2 new 2 storey single family dwellings - Part 1 | — | Closed |
| Jun 27, 2023 | Building Permit Related(PS) | Plumbing - Proposal to demolish existing 1 storey single family dwelling to construct 2 new 2 storey single family dwellings - Part 1 | — | Closed |
| Jun 14, 2023 | Building Permit Related (DR) | Drain - Proposal to demolish existing 1 storey single family dwelling to construct 2 new 2 storey single family dwellings - Part 2 | — | Closed |
| Jun 14, 2023 | Building Permit Related(PS) | Plumbing - Proposal to demolish existing 1 storey single family dwelling to construct 2 new 2 storey single family dwellings - Part 2 | — | Closed |
| Jun 14, 2023 | Building Permit Related(MS) | HVAC - Proposal to demolish existing 1 storey single family dwelling to construct 2 new 2 storey single family dwellings - Part 2 | — | Closed |
| Mar 8, 2023 | New Building | Rev 1: REVISION TO PERMIT #22-100687DRAWINGS ARE SHOWING ONLY REVSION ITEMS PART 1 - West Lot, 54A Butterworth AveProposal to construct a new detached dwelling with an integral garage See also 22 100681 DEM, 21 107804 ZZC, and 21 119449 MV. | — | New build |
| Jan 19, 2023 | Building Permit Related(MS) | HVAC - PART 1 - West Lot, 54A Butterworth AveProposal to construct a new detached dwelling with an integral garage See also 22 100681 DEM, 21 107804 ZZC, and 21 119449 MV. | — | Closed |
| Jan 19, 2023 | Building Permit Related(MS) | HVAC - PART 2 - East Lot, 54B Butterworth AveProposal to construct a new detached dwelling with an integral garage See also 22 100681 DEM, 21 107808 ZZC, and 21 119450 MV. | — | Open |
| Apr 19, 2022 | Demolition | Proposal to demolish the existing 1 storey SFD-detached dwelling. | — | Demolition |
| Apr 8, 2022 | Building Permit Related (DR) | Drain - PART 2 - East Lot, 54B Butterworth AveProposal to construct a new detached dwelling with an integral garage and a 2nd suite in the basement. See also 22 100681 DEM, 21 107808 ZZC, and 21 119450 MV. | — | Open |
| Apr 8, 2022 | Building Permit Related(PS) | Plumbing - PART 2 - East Lot, 54B Butterworth AveProposal to construct a new detached dwelling with an integral garage and a 2nd suite in the basement. See also 22 100681 DEM, 21 107808 ZZC, and 21 119450 MV. | — | Open |
| Apr 8, 2022 | Building Permit Related (DR) | Drain - PART 1 - West Lot, 54A Butterworth AveProposal to construct a new detached dwelling with an integral garage and a 2nd suite in the basement. See also 22 100681 DEM, 21 107804 ZZC, and 21 119449 MV. | — | Open |
| Apr 8, 2022 | Building Permit Related(PS) | Plumbing - PART 1 - West Lot, 54A Butterworth AveProposal to construct a new detached dwelling with an integral garage and a 2nd suite in the basement. See also 22 100681 DEM, 21 107804 ZZC, and 21 119449 MV. | — | Open |
| Jan 18, 2021 | New Building | REV #1-REVISE LAYOUTProposed construction of a new, two storey, single family dwelling. | — | New build |
| Nov 9, 2020 | Multiple Projects | Rev 1: REVISIONS TO APPROVED PLAN FILE # 19 108447 BLD 00 [ AS CLOUDED ON THE DRAWINGS]Proposed interior alterations to existing ground floor and basement, proposed ground floor rear addition, proposed second floor addition, proposed rear deck, front porch, and basement walkout. | — | Closed |
| Sep 22, 2020 | Other(SR) | Installation of a 5 eet by 15.5 feet polycarbonate awning (total weight approx 90 ibs) on the side of a newly built. | $3K | Closed |
| May 27, 2020 | New Building | Revision to rear ground floor/basement layout and revised LVL sizesRevision to originally approved drawings. | — | New build |
| May 25, 2020 | New Building | Revision to rear ground floor /basement layout and revised LVL sizesCONSTRUCTION OF A NEW 2 STOREY DWELLING | — | New build |
| Apr 14, 2020 | New Building | Rev 1: EXISTING BUILDING TO BE DEMOLISHED TO BUILD A NEW 2 STOREY SINGLE FAMILY DWELLINGProposed new two storey dwelling with attached garage. | — | New build |
| Apr 14, 2020 | New Building | Rev 1: EXISTING BUILDING TO BE DEMOLISHED TO BUILD A NEW 2 STOREY SINGLE FAMILY DWELLINGProposed new two storey dwelling with attached garage. | — | New build |
| Apr 9, 2020 | Building Permit Related(MS) | HVAC - Proposed interior alterations to existing ground floor and basement, proposed ground floor rear addition, proposed second floor addition, proposed rear deck, front porch, and basement walkout. | — | Closed |
| Apr 9, 2020 | Building Permit Related(MS) | HVAC - Proposed construction of a new, two storey, single family dwelling. | — | Closed |
| Jan 24, 2020 | Building Permit Related(MS) | HVAC - Proposed new two storey dwelling with attached garage. | — | Closed |
| Jan 24, 2020 | Building Permit Related(MS) | HVAC - Proposed new two storey dwelling with attached garage. | — | Closed |
| Dec 13, 2019 | Building Permit Related(PS) | Plumbing - Proposed new two storey dwelling with attached garage. | — | Closed |
| Dec 11, 2019 | Building Permit Related (DR) | Drain - Proposed new two storey dwelling with attached garage. | — | Closed |
| Oct 30, 2019 | Building Permit Related(MS) | HVAC - CONSTRUCTION OF A NEW 2 STOREY DWELLING | — | Closed |
| Oct 29, 2019 | Building Permit Related(MS) | HVAC - CONSTRUCTION OF A NEW 2 STOREY DWELLING | — | Closed |
| Oct 25, 2019 | Building Permit Related (DR) | Drain - Proposed construction of a new, two storey, single family dwelling. | — | Closed |
The 40 most recent of 88 permits on record. Figures come from the City’s active and cleared permit datasets, refreshed daily — what that covers, and what it misses.
Every address on Butterworth Ave with a permit on record · 16
- 4 Butterworth Ave1 permit · to 2016
- 13 Butterworth Ave5 permits · to 2017
- 14 Butterworth Ave9 permits · to 2016
- 15 Butterworth Ave5 permits · to 2026
- 16 Butterworth Ave9 permits · to 2018
- 25 Butterworth Ave3 permits · to 2000
- 27 Butterworth Ave9 permits · to 2025
- 33 Butterworth Ave5 permits · to 2017
- 35 Butterworth Ave9 permits · to 2020
- 38 Butterworth Ave5 permits · to 2020
- 47 Butterworth Ave7 permits · to 2021
- 50 Butterworth Ave1 permit · to 2026
- 52 Butterworth Ave1 permit · to 2012
- 54 Butterworth Ave9 permits · to 2023
- 66 Butterworth Ave9 permits · to 2020
- 67 Butterworth Ave1 permit · to 2016