thepermitmap

Street · 1566 of 8,516 by permit count

Building permits on Bobmar Rd, Scarborough

The City of Toronto has 123 building permits on record for Bobmar Rd in Scarborough, going back to 2000. Those permits created 15 homes and removed 10, a net change of +5. Declared construction value totals $7.5M. Half of the 113 permits issued here came through within 59 days of the application. The most recent permit was issued Jul 14, 2026 at 41 Bobmar Rd.

Permits on record
1232000–2026
Declared construction value
$7.5Mas filed, not adjusted
Homes created
15dwelling units
Homes removed
10net +5
Typical wait
59 days32 days slower than the city

Permits issued per year

20002026 (part year)

Zoning

Most common zone
RD100.0% of permits · by-law 10.20
In detached-house zones
100.0%62.0% above the city’s 38.0%
Permits with a zone
123of 123 on record
  • Residential123 · 100%

The zoning categories the permits on Bobmar Rd fall in, under Zoning By-law 569-2013. These are the City's own category names. This counts permits, not land: it says where the building work happened under which rules, not how the area is carved up. What each zone allows, and what gets built in it.

Minor variances at the Committee of Adjustment

Applications on record
21since 2016

Some projects on Bobmar Rd need the Committee of Adjustment to approve a minor variance from the zoning by-law before a building permit can be applied for at all. Where that applies, the committee’s clock runs first and the permit wait above starts only once it has stopped. How variances work, and the approval rates.

Other streets in M1C

Lawson Rd148 permits
Old Kingston Rd145 permits
Bathgate Dr139 permits
Port Union Rd133 permits
Cedarview Dr123 permits
Watson St113 permits
Gladys Rd108 permits
Brumwell St97 permits

Looking for one address on Bobmar Rd? The address lookup shows every permit filed against a single house or building number.

Most recent permits

Issued Work What was filed Value Status
Jul 14, 2026 Building Permit Related(MS) Revison 01: revised drawings.HVAC - Proposal to construct a new Garden Suite in the rear yard — Open
Jun 23, 2026 New Laneway / Rear Yard Suite Revision 01: revised drawingsProposal to construct a new Garden Suite in the rear yard — Open
Feb 10, 2026 Building Permit Related(PS) Plumbing - Proposal to construct a new Garden Suite in the rear yard — Open
Feb 10, 2026 Building Permit Related (DR) Drain - Proposal to construct a new Garden Suite in the rear yard — Open
Nov 24, 2025 Building Permit Related (DR) Drain - Proposal for exisiting house to be demolished and the construction of a new three unit dwelling. — Closed
Nov 24, 2025 Building Permit Related(PS) Plumbing - Proposal for exisiting house to be demolished and the construction of a new three unit dwelling. — Closed
Aug 27, 2025 New Building REVISION 02: PROPOSED SHOWER ADDED TO MAIN FLOOR BATHROOM Revision: THIS IS A REVISION TO ARCHITECURAL DRAWINGS — New build
Aug 20, 2025 Demolition Demolition of existing 2 storey house — Demolition
May 21, 2025 New Building Proposal to demolish the existing structure and construct a new two storey detached duplex with a two car integral garage, covered front porch, rear deck and rear basement walkout. $1.0M New build
May 16, 2025 Building Permit Related(MS) HVAC Revision 01HVAC - Proposal to demolish existing dwelling and construct a new two storey dwelling with attached garage and finished basment. — Closed
May 15, 2025 Building Permit Related(MS) HVAC Revision 01HVAC - Proposal to construct new two storey garden suite. — Closed
May 6, 2025 Second Suite (New) Proposal for a 2nd unit (Secondary Suite) in the basement & minor interior alterations on the first floor level of this existing detached SFD. $20K Closed
May 6, 2025 Building Permit Related(PS) Plumbing - Proposal for basement apartment — Closed
Sep 29, 2024 Demolition DEMOLISHING THE EXISTING 1 STOREY HOUSE AND FRAME GARAGE — Demolition
Sep 29, 2024 New Building Proposal to construct 2 storey residential house with double garage and secondary suite in basement. $180K New build
Sep 29, 2024 Building Permit Related (DR) Drain - Proposal to construct 2 store residential house with double garage and secondary suite in basement. — Closed
Sep 29, 2024 Building Permit Related (DR) Drain - Proposal for garden suite — Closed
Sep 29, 2024 New Laneway / Rear Yard Suite Proposal for garden suite $225K Closed
Sep 29, 2024 Building Permit Related(PS) Plumbing - Proposal to construct 2 store residential house with double garage and secondary suite in basement. — Closed
Sep 29, 2024 Building Permit Related(PS) Plumbing - Proposal for garden suite — Closed
Jun 20, 2024 Building Permit Related (DR) Drain - A. LEGALIZATION OF AS-BUILT BASEMENT APARTMENT WITH MINOR INTERIOR ALTERATIONS.B. PROPOSED BELOW GRADE ENTRANCE FOR BASEMENT APARTMENT. — Closed
Jun 20, 2024 Building Permit Related(PS) Plumbing - A. LEGALIZATION OF AS-BUILT BASEMENT APARTMENT WITH MINOR INTERIOR ALTERATIONS.B. PROPOSED BELOW GRADE ENTRANCE FOR BASEMENT APARTMENT. — Closed
Jun 7, 2024 Multiple Projects A. LEGALIZATION OF AS-BUILT BASEMENT APARTMENT WITH MINOR INTERIOR ALTERATIONS.B. PROPOSED BELOW GRADE ENTRANCE FOR BASEMENT APARTMENT. $50K Closed
Nov 10, 2023 Demolition Proposal to demolish existing dwelling and construct a new two storey dwelling with attached garage and finished basment. — Demolition
Nov 10, 2023 Building Permit Related (DR) Drain - Proposal to construct new two storey garden suite. — Closed
Nov 10, 2023 Building Permit Related (DR) Drain - Proposal to demolish existing dwelling and construct a new two storey dwelling with attached garage and finished basment. — Closed
Nov 10, 2023 New Laneway / Rear Yard Suite Proposal to construct new two storey garden suite. $1.5M Closed
Nov 10, 2023 Building Permit Related(PS) Plumbing - Proposal to construct new two storey garden suite. — Closed
Nov 10, 2023 Building Permit Related(PS) Plumbing - Proposal to demolish existing dwelling and construct a new two storey dwelling with attached garage and finished basment. — Closed
May 15, 2023 New Building REV 01:- Change of walkout construction to an insulated walkout.Proposed demolition of existing 1-storey dwelling and construction of new 2-storey sfd with integrated garage — New build
May 15, 2023 New Building REV 01:- Change of walkout construction to an insulated walkout.Proposed demolition of existing 1-storey dwelling and construction of new 2-storey sfd with integrated garage — New build
Nov 17, 2022 Building Permit Related(PS) Plumbing - Proposal to convert the existing dwelling into 2 units house with interior alteration. — Open
Nov 17, 2022 Second Suite (New) Proposal to convert the existing dwelling into 2 units house with interior alteration. $10K Open
Oct 5, 2022 Demolition Proposed demolition of existing 2-storey dwelling (152.60m2) — Demolition
Oct 5, 2022 Building Permit Related (DR) Drain - Proposed demolition of existing 1-storey dwelling and construction of new 2-storey sfd with integrated garage — Closed
Oct 5, 2022 Building Permit Related(PS) Plumbing - Proposed demolition of existing 1-storey dwelling and construction of new 2-storey sfd with integrated garage — Closed
Oct 5, 2022 Building Permit Related(MS) HVAC - Proposed demolition of existing 1-storey dwelling and construction of new 2-storey sfd with integrated garage — Closed
Oct 4, 2022 Building Permit Related (DR) Drain - Proposed demolition of existing 1-storey dwelling and construction of new 2-storey sfd with integrated garage — Closed
Oct 4, 2022 Building Permit Related(MS) HVAC - Proposed demolition of existing 1-storey dwelling and construction of new 2-storey sfd with integrated garage — Closed
Oct 4, 2022 Building Permit Related(PS) Plumbing - Proposed demolition of existing 1-storey dwelling and construction of new 2-storey sfd with integrated garage — Open

The 40 most recent of 123 permits on record. Figures come from the City’s active and cleared permit datasets, refreshed daily — what that covers, and what it misses.

Every address on Bobmar Rd with a permit on record · 28

  • 9 Bobmar Rd1 permit · to 2001
  • 15 Bobmar Rd5 permits · to 2016
  • 27 Bobmar Rd1 permit · to 2014
  • 28 Bobmar Rd9 permits · to 2025
  • 29 Bobmar Rd5 permits · to 2014
  • 30 Bobmar Rd1 permit · to 2015
  • 31 Bobmar Rd5 permits · to 2012
  • 33 Bobmar Rd4 permits · to 2022
  • 34 Bobmar Rd2 permits · to 2015
  • 36 Bobmar Rd2 permits · to 2015
  • 38 Bobmar Rd7 permits · to 2024
  • 39 Bobmar Rd9 permits · to 2017
  • 41 Bobmar Rd9 permits · to 2026
  • 44 Bobmar Rd1 permit · to 2011
  • 49 Bobmar Rd4 permits · to 2025
  • 50 Bobmar Rd5 permits · to 2012
  • 58 Bobmar Rd2 permits · to 2007
  • 68 Bobmar Rd5 permits · to 2020
  • 69 Bobmar Rd9 permits · to 2021
  • 74 Bobmar Rd6 permits · to 2018
  • 78 Bobmar Rd6 permits · to 2014
  • 85 Bobmar Rd2 permits · to 2025
  • 87 Bobmar Rd3 permits · to 2018
  • 88 Bobmar Rd1 permit · to 2021
  • 89 Bobmar Rd6 permits · to 2016
  • 96 Bobmar Rd9 permits · to 2023
  • 99 Bobmar Rd3 permits · to 2024
  • 100 Bobmar Rd1 permit · to 2000
Source
City of Toronto Open Data
Dataset
Building permits, active + cleared
Records
123
Data through
2026-10-07
Refresh
Daily from the City
Sheet
STR-802