Street · 573 of 8,516 by permit count
Building permits on Bellefair Ave
The City of Toronto has 294 building permits on record for Bellefair Ave, going back to 1991. Those permits created 14 homes and removed 6, a net change of +8. Declared construction value totals $6.5M. Half of the 280 permits issued here came through within 16 days of the application. The most recent permit was applied for Oct 20, 2026 at 95 Bellefair Ave.
- Permits on record
- 2941991–2026
- Declared construction value
- $6.5Mas filed, not adjusted
- Homes created
- 14dwelling units
- Homes removed
- 6net +8
- Typical wait
- 16 days11 days faster than the city
Permits issued per year
Zoning
- Most common zone
- R100.0% of permits · by-law 10.10
- In detached-house zones
- 0.0%38.0% below the city’s 38.0%
- Permits with a zone
- 292of 294 on record
The zoning categories the permits on Bellefair Ave fall in, under Zoning By-law 569-2013. These are the City's own category names. This counts permits, not land: it says where the building work happened under which rules, not how the area is carved up. What each zone allows, and what gets built in it.
Minor variances at the Committee of Adjustment
- Applications on record
- 23since 2016
- Approved
- 90.9%in line with the city · 22 decided
Some projects on Bellefair Ave need the Committee of Adjustment to approve a minor variance from the zoning by-law before a building permit can be applied for at all. Where that applies, the committee’s clock runs first and the permit wait above starts only once it has stopped. How variances work, and the approval rates.
Most common work
Structures worked on
Postal areas
Other streets in M4L
Looking for one address on Bellefair Ave? The address lookup shows every permit filed against a single house or building number.
Most recent permits
| Issued | Work | What was filed | Value | Status |
|---|---|---|---|---|
| Oct 20, 2026 | Multiple Projects | REV02: Proposed revision for conversion to open front porch as shown on R4 drawings, all other previously approved work remains unchanged.Revision - new rear balcony at second floor and remove part of existing walls. New engineer signed the architectural set. | — | Open |
| Jul 28, 2026 | Multiple Projects | Proposed partial demolition of existing porch and construct a new upper tier deck. | $20K | Closed |
| Jun 30, 2026 | New Building | Rev 01 - Alteration to garage insulation, exterior cladding, front porch, related details Proposed new detached duplex with integral garage | — | New build |
| Jun 23, 2026 | Building Permit Related(MS) | HVAC - Proposal to alter existing 3 storey dwelling with interior alterations to all floors, rear three storey addition. See also 26 105084 ZAP and 26 108189 MV. | — | Open |
| Jun 12, 2026 | Multiple Projects | Proposal to alter existing 3 storey dwelling with interior alterations to all floors, rear three storey addition. See also 26 105084 ZAP and 26 108189 MV. | $1.2M | Open |
| Jun 12, 2026 | Building Permit Related (DR) | Drain - Proposal to alter existing 3 storey dwelling with interior alterations to all floors, rear three storey addition. See also 26 105084 ZAP and 26 108189 MV. | — | Open |
| Jun 12, 2026 | Building Permit Related(PS) | Plumbing - Proposal to alter existing 3 storey dwelling with interior alterations to all floors, rear three storey addition. See also 26 105084 ZAP and 26 108189 MV. | — | Open |
| May 21, 2026 | Back Water Valve (Sewer only) | Backwater Valve installation | — | Closed |
| Mar 26, 2026 | Other(SR) | Proposal to install solar panels atop roof. | $24K | Open |
| Feb 26, 2026 | Building Permit Related (DR) | Drain - Proposal to alter existing 3 storey dwelling with interior alterations to basement and basement underpinning | — | Open |
| Feb 24, 2026 | Multiple Projects | Proposal to alter existing 3 storey dwelling with interior alterations to basement and basement underpinning | $100K | Open |
| Feb 24, 2026 | Building Permit Related(PS) | Plumbing - Proposal to alter existing 3 storey dwelling with interior alterations to basement and basement underpinning | — | Open |
| Feb 23, 2026 | Garage | Garage Demo | $5K | Closed |
| Feb 18, 2026 | Porch | Proposed porch reinforcement. | $20K | Closed |
| Jan 23, 2026 | Back Water Valve (Sewer only) | Installation of new backwater valve on existing main sanitary drain. | — | Closed |
| Jan 12, 2026 | Building Permit Related(MS) | HVAC - Proposal for multiple projects (addition, second unit, interior alterations, basement finishing, deck, terrace and basement underpinning). | — | Closed |
| Dec 15, 2025 | Building Permit Related(MS) | HVAC - Proposed new detached duplex with integral garage | — | Open |
| Dec 15, 2025 | Building Permit Related(MS) | HVAC - Proposal for new detached duplex with integral garage | — | Open |
| Nov 25, 2025 | Accessory Building(s) | Proposal to reconstruct the rear one storey semi-detached garage, new covered porch, and new spa.See also 24 190761 ZAP and 25 132557 MV. | $85K | Closed |
| Nov 3, 2025 | Garage | Proposal to reconstruct the rear one storey semi-detached garage.See also 25 104584 ZAP and 25 132535 MV. | $65K | Closed |
| Oct 22, 2025 | Building Permit Related(PS) | Plumbing - Proposal for multiple projects (addition, second unit, interior alterations, basement finishing, deck, terrace and basement underpinning). | — | Closed |
| Oct 22, 2025 | Multiple Projects | Proposal for multiple projects (addition, second unit, interior alterations, basement finishing, deck, terrace and basement underpinning). | $650K | Open |
| Oct 22, 2025 | Building Permit Related (DR) | Drain - Proposal for multiple projects (addition, second unit, interior alterations, basement finishing, deck, terrace and basement underpinning). | — | Open |
| Oct 16, 2025 | Building Permit Related(MS) | HVAC - Proposal for rear and second floor addition. | — | Open |
| Sep 15, 2025 | Back Water Valve (Sewer only) | Replacing sewer pipe, adding backwater valve and sewer clean out, from house to city pipe. | — | Open |
| Aug 15, 2025 | Multiple Projects | Proposal for underpinning, legal secondary unit in basement, structural wall removal and front corner addition. | $60K | Open |
| Jun 18, 2025 | Building Permit Related(PS) | Plumbing - Proposal for new detached duplex with integral garage | — | Open |
| Jun 18, 2025 | Building Permit Related (DR) | Drain - Proposal for new detached duplex with integral garage | — | Open |
| Jun 18, 2025 | New Building | Proposal for new detached duplex with integral garage | $300K | New build |
| May 26, 2025 | Addition(s) | REVISION 01: interior structural alterations, addition on piers not on foundation, raise 2nd floor.Proposal for rear and second floor addition. | — | Open |
| Apr 7, 2025 | Demolition | Demolition existing sfd | — | Demolition |
| Apr 7, 2025 | Building Permit Related (DR) | Drain - Proposed new detached duplex with integral garage | — | Open |
| Apr 7, 2025 | Building Permit Related(PS) | Plumbing - Proposed new detached duplex with integral garage | — | Open |
| Nov 22, 2024 | Building Permit Related (DR) | Drain - Proposal for rear and second floor addition. | — | Closed |
| Nov 22, 2024 | Building Permit Related(PS) | Plumbing - Proposal for rear and second floor addition. | — | Open |
| Aug 9, 2024 | Building Permit Related(MS) | HVAC - Proposed basement underpinning, internal renovation of ground and second floor, and modification of existing rear side deck. | — | Closed |
| Aug 1, 2024 | Porch | To construct front porch and stairs to the existing semi-detached dwelling | $10K | Closed |
| Aug 1, 2024 | Porch | To construct front porch and stairs to the existing semi-detached dwelling | $10K | Closed |
| Jul 24, 2024 | Deck | REPLACEMENT OF EXISTING DECK | $20K | Closed |
| Jul 18, 2024 | Building Permit Related(MS) | HVAC - Proposal for front second floor addition, interior alterations, cladding and new roof. | — | Open |
The 40 most recent of 294 permits on record. Figures come from the City’s active and cleared permit datasets, refreshed daily — what that covers, and what it misses.
Every address on Bellefair Ave with a permit on record · 93
- 4 Bellefair Ave4 permits · to 2025
- 5 Bellefair Ave3 permits · to 2019
- 6 Bellefair Ave3 permits · to 2025
- 8 Bellefair Ave5 permits · to 2021
- 10 Bellefair Ave3 permits · to 2019
- 12 Bellefair Ave4 permits · to 2019
- 15 Bellefair Ave4 permits · to 2018
- 17 Bellefair Ave3 permits · to 2019
- 18 Bellefair Ave2 permits · to 2006
- 19 Bellefair Ave1 permit · to 2017
- 21 Bellefair Ave3 permits · to 2024
- 22 Bellefair Ave6 permits · to 2019
- 25 Bellefair Ave1 permit · to 2007
- 26 Bellefair Ave6 permits · to 2013
- 28 Bellefair Ave3 permits · to 2009
- 32 Bellefair Ave2 permits · to 2018
- 35 Bellefair Ave4 permits · to 2004
- 36 Bellefair Ave4 permits · to 2018
- 37 Bellefair Ave2 permits · to 2018
- 42 Bellefair Ave4 permits · to 2023
- 44 Bellefair Ave1 permit · to 2021
- 47 Bellefair Ave12 permits · to 2008
- 48 Bellefair Ave4 permits · to 2025
- 50 Bellefair Ave6 permits · to 2015
- 54 Bellefair Ave4 permits · to 2018
- 57 Bellefair Ave4 permits · to 2019
- 60 Bellefair Ave3 permits · to 2026
- 62 Bellefair Ave1 permit · to 2014
- 64 Bellefair Ave1 permit · to 2019
- 66 Bellefair Ave1 permit · to 2000
- 68 Bellefair Ave3 permits · to 2025
- 69 Bellefair Ave9 permits · to 2026
- 70 Bellefair Ave4 permits · to 2019
- 73 Bellefair Ave1 permit · to 2003
- 75 Bellefair Ave4 permits · to 2007
- 76 Bellefair Ave5 permits · to 2021
- 77 Bellefair Ave3 permits · to 2026
- 79 Bellefair Ave2 permits · to 2011
- 81 Bellefair Ave3 permits · to 2012
- 83 Bellefair Ave5 permits · to 2023
- 84 Bellefair Ave2 permits · to 2022
- 85 Bellefair Ave3 permits · to 2018
- 86 Bellefair Ave6 permits · to 2024
- 88 Bellefair Ave1 permit · to 2005
- 89 Bellefair Ave2 permits · to 2001
- 92 Bellefair Ave8 permits · to 2026
- 93 Bellefair Ave2 permits · to 2009
- 94 Bellefair Ave3 permits · to 2025
- 95 Bellefair Ave5 permits · to 2026
- 96 Bellefair Ave1 permit · to 2014
- 101 Bellefair Ave3 permits · to 2022
- 102 Bellefair Ave6 permits · to 2022
- 104 Bellefair Ave4 permits · to 2016
- 106 Bellefair Ave1 permit · to 2015
- 108 Bellefair Ave1 permit · to 2018
- 109 Bellefair Ave2 permits · to 2005
- 111 Bellefair Ave3 permits · to 2022
- 112 Bellefair Ave6 permits · to 2021
- 113 Bellefair Ave7 permits · to 2026
- 114 Bellefair Ave2 permits · to 2022
- 115 Bellefair Ave1 permit · to 2014
- 117 Bellefair Ave1 permit · to 2010
- 119 Bellefair Ave5 permits · to 2018
- 124 Bellefair Ave1 permit · to 2011
- 126 Bellefair Ave1 permit · to 2014
- 128 Bellefair Ave2 permits · to 2007
- 130 Bellefair Ave1 permit · to 2018
- 132 Bellefair Ave3 permits · to 2018
- 134 Bellefair Ave1 permit · to 2021
- 136 Bellefair Ave2 permits · to 2021
- 137 Bellefair Ave1 permit · to 2016
- 138 Bellefair Ave1 permit · to 2016
- 139 Bellefair Ave3 permits · to 2016
- 140 Bellefair Ave2 permits · to 2001
- 142 Bellefair Ave1 permit · to 2006
- 143 Bellefair Ave1 permit · to 2012
- 144 Bellefair Ave2 permits · to 2002
- 145 Bellefair Ave9 permits · to 2008
- 149 Bellefair Ave2 permits · to 2017
- 153 Bellefair Ave1 permit · to 2001
- 155 Bellefair Ave2 permits · to 2021
- 159 Bellefair Ave3 permits · to 2021
- 162 Bellefair Ave5 permits · to 2024
- 164 Bellefair Ave6 permits · to 2024
- 167 Bellefair Ave1 permit · to 2000
- 168 Bellefair Ave1 permit · to 2026
- 175 Bellefair Ave5 permits · to 2019
- 176 Bellefair Ave3 permits · to 2006
- 177 Bellefair Ave4 permits · to 2005
- 178 Bellefair Ave7 permits · to 2009
- 182 Bellefair Ave1 permit · to 2021
- 183 Bellefair Ave3 permits · to 2007
- 192 Bellefair Ave1 permit · to 2008