Neighbourhood · 64 of 158 by permit count
Building permits in Humewood-Cedarvale
The City of Toronto has 6,048 building permits on record for the Humewood-Cedarvale neighbourhood, going back to 1988. Those permits created 1,498 homes and removed 249, a net change of +1,249. Declared construction value totals $972.2M. Half of the 5,760 permits issued here came through within 17 days of the application. The most recent permit was applied for Oct 30, 2026 at 48 Camberwell Rd.
- Permits on record
- 6,0481988–2026
- Declared construction value
- $972.2Mas filed, not adjusted
- Homes created
- 1,498dwelling units
- Homes removed
- 249net +1,249
- Typical wait
- 17 days10 days faster than the city
Permits issued per year
Zoning
- Most common zone
- RM46.6% of permits · by-law 10.80
- In detached-house zones
- 44.0%6.0% above the city’s 38.0%
- Permits with a zone
- 5,912of 6,048 on record
The zoning categories the permits in Humewood-Cedarvale fall in, under Zoning By-law 569-2013. These are the City's own category names. This counts permits, not land: it says where the building work happened under which rules, not how the area is carved up. What each zone allows, and what gets built in it.
Minor variances at the Committee of Adjustment
- Applications on record
- 466since 2016
- Approved
- 92.3%1.5% above the city · 415 decided
- Median time to a decision
- 143 days23 days slower than the city
Some projects in Humewood-Cedarvale need the Committee of Adjustment to approve a minor variance from the zoning by-law before a building permit can be applied for at all. Where that applies, the committee’s clock runs first and the permit wait above starts only once it has stopped. Back to back, that is about 160 days, not the 17 days the permit figure alone suggests. How variances work, and the approval rates.
Most common work
Structures worked on
Postal areas
Most recent permits
| Issued | Address | Work | What was filed | Value | Status |
|---|---|---|---|---|---|
| Oct 30, 2026 | 48 Camberwell Rd | Building Permit Related(MS) | Revision No.1:HVAC - Proposal for basement underpinning (31.11m), interior alterations (236.73 m²) rear yard and second storey addition (202 m²) with rear deck. | — | Open |
| Oct 30, 2026 | 93 Pinewood Ave | Demolition | Proposal to demolish the existing three storey detached single family dwelling and construct a new three storey detached single family dwelling with finished basement, integral garage and a rear deck. | — | Demolition |
| Oct 29, 2026 | 34 Cherrywood Ave | Back Water Valve (Sewer only) | install backwater valve | — | Closed |
| Oct 29, 2026 | 93 Pinewood Ave | Building Permit Related (DR) | Drain - Proposal to demolish the existing three storey detached single family dwelling and construct a new three storey detached single family dwelling with finished basement, integral garage and a rear deck | — | Open |
| Oct 29, 2026 | 93 Pinewood Ave | Building Permit Related(PS) | Plumbing - Proposal to demolish the existing three storey detached single family dwelling and construct a new three storey detached single family dwelling with finished basement, integral garage and a rear deck | — | Open |
| Oct 29, 2026 | 93 Pinewood Ave | New Building | Proposal to demolish the existing three storey detached single family dwelling and construct a new three storey detached single family dwelling with finished basement, integral garage and a rear deck. | $1.9M | New build |
| Oct 29, 2026 | 150 Strathearn Rd | New Building | REV01: Proposed revision to front landscapingProposal to construct a new 2 storey SFD-detached dwelling with an integral garage and finished basement. See also 18 251561 DEM, 18 118284 ZZC, and 18 146186 MV. | — | New build |
| Oct 28, 2026 | 9 Wellwood Ave | Back Water Valve (Sewer only) | Backwater valve on sanitary line | — | Closed |
| Oct 27, 2026 | 490 Arlington Ave | Building Permit Related(PS) | Plumbing - Proposed second-storey addition above existing garage and enlargement of existing attached garage. | — | Open |
| Oct 27, 2026 | 490 Arlington Ave | Building Permit Related(MS) | HVAC - Proposed second-storey addition above existing garage and enlargement of existing attached garage. | — | Open |
| Oct 27, 2026 | 490 Arlington Ave | Addition(s) | Proposed second-storey addition above existing garage and enlargement of existing attached garage. | $100K | Open |
| Oct 27, 2026 | 91 Raglan Ave | Other(MS) | Geothermal energy well drilling for the 30 storey rental building to be constructed on the lands of 91-101 Raglan Ave | $100.0M | Open |
| Oct 23, 2026 | 630 Rushton Rd | Building Permit Related(PS) | REV01: Proposed changes to plumbing fixtures associated with proposed removal of third floor and change in floor layout.Plumbing - Proposed front, rear, side, and 3rd floor additions to an existing single family detached dwelling. | — | Open |
| Oct 23, 2026 | 240 Maplewood Ave | Building Permit Related (DR) | Drain - REAR TWO STOREY ADDITION WITH SHORING DESIGN | — | Open |
| Oct 23, 2026 | 240 Maplewood Ave | Building Permit Related(PS) | Plumbing - REAR TWO STOREY ADDITION WITH SHORING DESIGN | — | Open |
| Oct 23, 2026 | 133 Chiltern Hill Rd | New Building | REV 01: Revision to permit. Structural Changes to ground floor design. NEW 2 STOREY SFD | — | New build |
| Oct 22, 2026 | 485 Rushton Rd | Building Permit Related(MS) | HVAC - Proposal for second floor addition, interior alterations & repairs. | — | Open |
| Oct 22, 2026 | 536 Arlington Ave | Addition(s) | Proposed basement addition and newly configured rear terrace at the 1st floor. | $65K | Open |
| Oct 22, 2026 | 240 Maplewood Ave | Multiple Projects | REAR TWO STOREY ADDITION WITH SHORING DESIGN | $400K | Open |
| Oct 21, 2026 | 485 Rushton Rd | Multiple Projects | Proposal for second floor addition, interior alterations & repairs. | $500K | Open |
| Oct 21, 2026 | 278 Wychwood Ave | Building Permit Related(MS) | HVAC - Proposal for ground floor and second floor additions with interior alterations. | — | Open |
| Oct 20, 2026 | 333 Arlington Ave | Back Water Valve (Sewer only) | Installation of Main Drain Pipe Backwater Valve. | — | Closed |
| Oct 20, 2026 | 57 Cherrywood Ave | Back Water Valve (Sewer only) | Back water valve installation | — | Open |
| Oct 20, 2026 | 278 Wychwood Ave | Multiple Projects | Proposal for ground floor and second floor additions with interior alterations. | $300K | Open |
| Oct 20, 2026 | 278 Wychwood Ave | Building Permit Related(PS) | Plumbing - Proposal for ground floor and second floor additions with interior alterations. | — | Open |
| Oct 20, 2026 | 278 Wychwood Ave | Building Permit Related (DR) | Drain - Proposal for ground floor and second floor additions with interior alterations. | — | Open |
| Oct 19, 2026 | 91 Raglan Ave | Partial Permit - Shoring | Part Permit - Proposal for 30 storey residential development with 4 levels of below grade parking. Total of 290 residential dwelling units with small retail frontage along Raglan AveReference: 21 213475 STE 12 SA | — | Open |
| Oct 19, 2026 | 91 Raglan Ave | Partial Permit - Foundation | Part Permit - Proposal for 30 storey residential development with 4 levels of below grade parking. Total of 290 residential dwelling units with small retail frontage along Raglan AveReference: 21 213475 STE 12 SA | — | Open |
| Oct 19, 2026 | 91 Raglan Ave | Partial Permit - Structural Framing | Part Permit - Proposal for 30 storey residential development with 4 levels of below grade parking. Total of 290 residential dwelling units with small retail frontage along Raglan AveReference: 21 213475 STE 12 SA | — | Open |
| Oct 19, 2026 | 630 Rushton Rd | Multiple Projects | REV01: Proposal for revision to remove third floor and change floor layout.Proposed front, rear, side, and 3rd floor additions, basement walkout, deck, front porch, second floor balconies, third floor balconies, to an existing single family detached dwelling | — | Open |
| Oct 15, 2026 | 153 Glen Cedar Rd | Building Permit Related(MS) | HVAC - Interior alteration on basement, ground and second floor and rear addition to ground floor, including related mechanical and structural work. | — | Open |
| Oct 15, 2026 | 153 Glen Cedar Rd | Multiple Projects | Interior alteration on basement, ground and second floor and rear addition to ground floor, including related mechanical and structural work. | $250K | Open |
| Oct 15, 2026 | 153 Glen Cedar Rd | Building Permit Related(PS) | Plumbing - Interior alteration on basement, ground and second floor and rear addition to ground floor, including related mechanical and structural work. | — | Open |
| Oct 15, 2026 | 389 Winnett Ave | Multiple Projects | Proposed repair and replacement of existing windows, exterior cladding, and canopy roof assemblies due to water damage, | $100K | Open |
| Oct 15, 2026 | 22 Glen Cedar Rd | Building Permit Related(PS) | Plumbing - Proposed 3 storey sigle family dwelling. | — | Open |
| Oct 15, 2026 | 22 Glen Cedar Rd | Building Permit Related (DR) | Drain - Proposed 3 storey sigle family dwelling. | — | Open |
| Oct 15, 2026 | 22 Glen Cedar Rd | Demolition | Proposed 3 storey sigle family dwelling. | — | Demolition |
| Oct 15, 2026 | 22 Glen Cedar Rd | New Building | Proposed 3 storey sigle family dwelling. | $1.5M | New build |
| Oct 15, 2026 | 125 Ava Rd | New Building | REVISION - PRECAST CANOPY AND POSTS ARE REPLACED WITH WOOD CANOPY AND POSTSPROPOSED NEW 2 STOREY SFD WITH INTERGRATED GARAGE | — | New build |
| Oct 14, 2026 | 146 Chiltern Hill Rd | Building Permit Related (DR) | Drain - Interior alterations to existing single detached swelling, including removal and construction of interior partitions and structural modifications | — | Open |
The 40 most recent of 6,048 permits on record. Figures come from the City’s active and cleared permit datasets, refreshed daily — what that covers, and what it misses.