Street · 3822 of 8,565 by permit count
Building permits on Ibms Ward 01
The City of Toronto has 40 building permits on record for Ibms Ward 01, going back to 2004. Declared construction value totals $16.6M. The most recent permit was issued Jul 29, 2026 at 1 IBMS WARD 01.
- Permits on record
- 402004–2026
- Declared construction value
- $16.6Mas filed, not adjusted
- Homes created
- 0dwelling units
- Homes removed
- 0net +0
Permits issued per year
20042026 (part year)
Most common work
Structures worked on
Most recent permits
| Issued | Work | What was filed | Value | Status |
|---|---|---|---|---|
| Jul 29, 2026 | New Building | Resources Road Logistic Hub consists of two single-story, pre-assembled modular trailers. These trailers are connected by an exterior elevated walkway, served by three access points: stairs at each end and a ramp in the middle. The walkway is covered by a continuous canopy. Together, they effectivel | $500K | New build |
| Dec 4, 2024 | Electromagnetic Locks | PROPOSAL FOR INSTALLATION OF TWO (2) ELECTRO-MAGNETIC LOCKING DEVICES20 176138 BLD 00 NB | $8K | Closed |
| Jun 26, 2024 | Inside and Outside Drains | Drain - Construct an at grade stop for the FWLRT - Westmore Westbound | $750K | Closed |
| Jun 25, 2024 | Inside and Outside Drains | Drain - Construct an at grade stop for the FWLRT - Mount Olive Dr - Westbound | $750K | Closed |
| Jun 25, 2024 | Inside and Outside Drains | Drain - Construct an at grade stop for the FWLRT - Mount Olive Dr - Eastbound | $750K | Closed |
| Jun 24, 2024 | Inside and Outside Drains | Drain - Construct an at grade stop for the FWLRT - Westmore Eastbound | $750K | Closed |
| Jun 21, 2024 | Inside and Outside Drains | Drain - Construct an at grade stop for the FWLRT - Stevenson Westbound | $750K | Closed |
| Jun 21, 2024 | Inside and Outside Drains | Drain - Construct an at grade stop for the FWLRT - Stevenson Eastbound | $750K | Closed |
| Jun 21, 2024 | Inside and Outside Drains | Drain - Construct an at grade stop for the FWLRT - Martin Grove stop Westbound | $750K | Closed |
| Jun 21, 2024 | Inside and Outside Drains | Drain - Construct an at grade stop for the FWLRT - Martin Grove stop Eastbound | $750K | Closed |
| Jun 21, 2024 | Inside and Outside Drains | Drain - Construct an at grade stop for the FWLRT - Albion stop Westbound | $750K | Closed |
| Jun 21, 2024 | Inside and Outside Drains | Drain - Construct an at grade stop for the FWLRT - Albion stop Eastbound | $750K | Closed |
| Oct 18, 2023 | New Building | Revision 01 - electrical fire alarm updated to refledt PVIS as an Emergency notification deviceTo construct Humber College Stop, the beginning of Finch West LRT terminal - on SW corner of Highway 27 and Humber College Blvd | — | New build |
| Jun 13, 2023 | Alternative Solution | Alternative Solution for Humber College Station (HCS) is the terminus station on the western end of the Finch West Light Rail Transit (FWLRT) project, situated at 7932 Highway 27 in Etobicoke, ON. The HCS platform will be positioned below grade but will be open to the atmosphere. Passengers will be | — | Closed |
| Jun 13, 2023 | Alternative Solution | Humber College Station (HCS) is the terminus station on the western end of the Finch West Light Rail Transit (FWLRT) project, situated at 7932 Highway 27 in Etobicoke, ON. The HCS platform will be positioned below grade but will be open to the atmosphere. Passengers will be able to access the statio | — | Open |
| Dec 5, 2022 | New Building | Construct an at grade stop for the FWLRT - Stevenson Westbound | $750K | New build |
| Dec 5, 2022 | New Building | Construct an at grade stop for the FWLRT - Mount Olive Dr - Westbound | $750K | New build |
| Nov 28, 2022 | New Building | Construct an at grade stop for the FWLRT - Stevenson Eastbound | $750K | New build |
| Nov 28, 2022 | New Building | Construct an at grade stop for the FWLRT - Mount Olive Dr - Eastbound | $750K | New build |
| Sep 1, 2022 | New Building | Construct an at grade stop for the FWLRT - Albion stop Westbound | $750K | New build |
| Sep 1, 2022 | New Building | Construct an at grade stop for the FWLRT - Albion stop Eastbound | $750K | New build |
| Aug 24, 2022 | New Building | Construct an at grade stop for the FWLRT - Westmore Westbound | $750K | New build |
| Aug 24, 2022 | New Building | Construct an at grade stop for the FWLRT - Westmore Eastbound | $750K | New build |
| Aug 12, 2022 | New Building | Construct an at grade stop for the FWLRT - Martin Grove stop Westbound | $750K | New build |
| Aug 12, 2022 | New Building | Construct an at grade stop for the FWLRT - Martin Grove stop Eastbound | $750K | New build |
| Jun 14, 2022 | Retaining Wall | Construct retaining wall #3 Part B for FWLRT | $377K | Closed |
| Dec 3, 2021 | Building Permit Related(MS) | HVAC - To construct Humber College Stop, the beginning of Finch West LRT terminal - on SW corner of Highway 27 and Humber College Blvd | — | Closed |
| Dec 3, 2021 | Partial Permit - Structural Framing | Conditional Permit - Part Permit - To construct Humber College Stop, the beginning of Finch West LRT terminal - on SW corner of Highway 27 and Humber College Blvd | — | Closed |
| Oct 13, 2021 | New Building | Construct an at grade stop for the FWLRT - Mount Olive Dr - Eastbound | — | New build |
| Oct 7, 2021 | Building Permit Related(PS) | Plumbing - To construct Humber College Stop, the beginning of Finch West LRT terminal - on SW corner of Highway 27 and Humber College Blvd | — | Closed |
| Oct 6, 2021 | Building Permit Related (DR) | Drain - To construct Humber College Stop, the beginning of Finch West LRT terminal - on SW corner of Highway 27 and Humber College Blvd | — | Closed |
| Oct 6, 2021 | Partial Permit - Foundation | Conditional Permit - Part Permit - To construct Humber College Stop, the beginning of Finch West LRT terminal - on SW corner of Highway 27 and Humber College Blvd | — | Closed |
| Jun 3, 2021 | Retaining Wall | Construct retaining wall #01A and tow wall #3 at west side Finch Ave W and Islington Ave - PT C | $325K | Closed |
| Apr 19, 2021 | Alternative Solution | Alternative solution to reduce the travel distances to the nearest exit stairs leading to the entrance enclosures | — | Open |
| Apr 12, 2021 | Alternative Solution | Humber College Stop (HCS), located at 7932 ON 27, will be a terminus for the Finch West Light Rail Transit (FWLRT) line. HCS is classified as a rapid transit station conforming to the requirements of OBC Section 3.13. The station will have two at-grade entrance buildings connecting down to a below-g | — | Closed |
| Nov 6, 2020 | Partial Permit - Shoring | Conditional Permit - Part Permit - To construct Humber College Stop, the beginning of Finch West LRT terminal - on SW corner of Highway 27 and Humber College Blvd | — | Closed |
| Oct 25, 2019 | New Building | Replace existing transit shelter with a new Wheel-Trans Access Hub Shelter (14m2) at the N/W corner of Kipling Ave and Dixon Rd | $390K | New build |
| Feb 25, 2005 | Building Permit Related(MS) | HVAC - Revision to HVAC ductwork in Storage Room of Existing Community Centre - Addition(s) | — | Closed |
| Jun 17, 2004 | New Building | Construct a new dry storage building. Existing: vacant land. Proposed: Storage Building. | $20K | New build |
| Jan 15, 2004 | Electromagnetic Locks | To install 4 maglocks to Sears warehouse on main floor | $1K | Closed |
The 40 most recent of 40 permits on record. Figures come from the City’s active and cleared permit datasets, refreshed daily — what that covers, and what it misses.